PREPARE THE GROUND, UNWRAP THE
LAY OUT THE COMPONENTS, FIND THE
1/24
PACKAGE,
TOOLS.
M8×70
VICTORIA C 40
× 65
× 60
× 15
× 850
× 110
× 40

Advertisement

loading
Need help?

Need help?

Do you have a question about the VICTORIA C 40 and is the answer not in the manual?

Questions and answers

Summary of Contents for Ez Log Structures VICTORIA C 40

  • Page 1 VICTORIA C 40 PREPARE THE GROUND, UNWRAP THE PACKAGE, LAY OUT THE COMPONENTS, FIND THE TOOLS. × 850 × 65 × 60 × 110 M8×70 × 15 × 40 1/24...
  • Page 2 LAY OUT THE FOUNDATION BEAMS AB=CD SQUARE IT BY MEASURING FROM CORNER TO CORNER. 0° IFB1 IFB2 IFB3 MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE. IFB4 CHECKING ALL DIRECTIONS, IFB5 2/24 INCLUDING CORNER TO CORNER.
  • Page 3 ATTACH FOUNDATION BEAMS WITH SCREWS. × 2 × 10 5×70 6×140 3/24...
  • Page 4 LAY OUT THE BOTTOM LOGS SO, THAT DOOR OPENING WILL BE 1441 MM WIDE 1441 mm 2 LG-1 A BL-1 B BL-1 1 LG-1 4/24...
  • Page 5 ATTACH LOGS TO THE FOUNDATION. × 6 × 12 6×140 5×70 THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS APPROXIMATELY 5MM. THIS OVERHANG 5/24 IS DESIGNED AS A RAIN DRIP.
  • Page 6 ATTACH THE NEXT ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS. × 3 × 6 A LG-1 6×140 5×70 B LG-2 6/24...
  • Page 7 AFTER PLACING 3-4 ROWS OF WALL LOGS, TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED, TO TIGHTEN THE LOGS. HITBLOCK 1 LG-6 7/24...
  • Page 8 SLIDE THE DOOR IN, ATTACH THE HANDLE. CDD6R LOGS IN PLACE 8/24...
  • Page 9 DON`T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3-4 ROWS. HITBLOCK B LG-4 1 LG-3 B LG-1 1 LG-2 9/24...
  • Page 10 SLIDE THE WINDOWS IN, ATTACH THE HANDLE. CDW2L CDW2R 10/24...
  • Page 11 2 LG-2 1 LG-5 B LG-6 1 LG-4 LOGS HALF LOG IN PLACE B LG-3 1 LG-7 11/24...
  • Page 12 INSTALL CEILING TRIANGLE ATTACH WITH SCREWS INTO THE WALLS. 4×50 × 6 × 5 5×70 CEILING DETAIL 40×120 CEILING LEAVE 4CM CAP BETWEEN TRIANGLE DOOR AND CEILING DETAIL, ATTACH IT INTO WALLS AND INTO 12/24 CEILING TRIANGLE USING SCREWS...
  • Page 13 ATTACH TOP LOGS INTO WALL LOGS WITH SCREWS. × 40 2 TL-1 2 TL-2 A TL-1 A TL-3 2 TL-3 A TL-2 B TL-2 A TL-4 B TL-1 1 TL-3 B TL-4 1 TL-1 1 TL-2 B TL-3 13/24...
  • Page 14 CONNECT THE ROOF PURLINS (RFR) WITH BEFORE INSTALLING THEM ON TOP OF THE CORNERS. 14/24...
  • Page 15 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS. × 4 15/24...
  • Page 16 INSTALL THE ROOF PURLINS (RFB) AND ATTACH THEM WITH SCREWS. × 16 × 16 5×70 RFB3 RFB1 6×140 RFB2 RFB4 16/24...
  • Page 17 PLACE THE FIRST ROOFBOARD FLUSH WITH THE OF THE PURLINS AND ATTACH WITH SCREWS × 408 RB21 17/24...
  • Page 18 INSTALL THE ROOF TOP AND ATTACH WITH SCREWS. ATTACH FASCIA TRIMS INTO ROOFPURLINS. × 40 ROOF TOP 18/24...
  • Page 19 SCREW THE FLOORBOARDS INTO FOUNDATION, SAW THE LAST BOARD TO MAKE IT FIT. × 288 19/24...
  • Page 20 SAW THE BASEBOARDS AND ATTACH WITH NAILS EVERY 0,5 METERS. × 40 20/24...
  • Page 21 DRILL THROUGH THE WALL, HOLE MUST BE AT THE BOTTOM OF THE OVAL, 20CM ATTACH WITH BOLT. × 15 WINDBOARD 21/24...
  • Page 22 IF DOOR IS TILTED, PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90º. 90º 90º 22/24...
  • Page 23 DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM, ADJUST 3 SCREWS ON DOOR HINGES. 23/24...
  • Page 24 WHEN THE HOUSE IS ASSEMBLED, YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL, PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD. 24/24 100%...