Download Print this page

StudioDesk PCTWBL Assembly Manual

Pc throne tower

Advertisement

Quick Links

PCTWBL
PC THRONE TOWER
FOLLOW THE LINK FOR STEP BY STEP
VIDEO ASSEMBLY MANUAL
!
Please assemble your product on soft 
surface to avoid scratches and damages 
on lacquer.
www.studiodesk.net

Advertisement

loading
Need help?

Need help?

Do you have a question about the PCTWBL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for StudioDesk PCTWBL

  • Page 1 PCTWBL PC THRONE TOWER FOLLOW THE LINK FOR STEP BY STEP VIDEO ASSEMBLY MANUAL Please assemble your product on soft  surface to avoid scratches and damages  on lacquer.
  • Page 2 The Desk You Deserve Thank you for making StudioDesk your choice! Before beginning assembly of your stand, lets get familiar with the parts you have received in your package.  Please match the corresponding numbers on this page with the drawings. Parts 1. Perforated mask 2. Top and bottom board 3. Central vertical board 4. Front and back board 5. Shelves Bottom NOTE LED Strips are installed. It will work only if connected to VALOR Station LED network.  Hardware Tools needed (Not included) Wooden Dowels  M6 Screw  Plastic cover  7 pcs 12 pcs  Hexagon  5 pcs 2 pcs Glides Screw Shelf holder  3x16 wood 4 pcs 8 pcs 4 pcs...
  • Page 3 Parts in use Step One Install Dowels to Vertical boards.  Install  connection inserts as shown  in the illustration on the right right.   Inserts has to point towards up.  Step TWO Connect top board and main vertical  board with dowels. Make sure that  inserts are positioned on the right side  as shown on the illustration.  Step Three Fasten top board to the main vertical  board using long screws 6 x 50. If  screws does not find its thread,  make sure that inserts are pointing  towards up. ...
  • Page 4 Step Four Connect top board with rest of the  vertical boards on dowels as  shown in the illustration.   Parts in use Step Five LED Lights Install headphone holder to the perforated mask  using M6 screw.  Step Six Fix mask to the vertical board with screws on  the both sides.   Should you using electric screwdriver, reduce torque to minimum. ...
  • Page 5 Step Seven    LED Lights installed inside the tower  has  to be connected to the VALOR Desk  LED Network. Take the long cable from the VALOR Desk LED set and connect it so the  arrows on the connectors meet each other  As shown on the illustration on the right.   Step Eight To secure connection firm, use enclosed shrink tube heated with lighter.   Step Nine Pull the cable trough the hole on the  bottom  plate and secure It pushing it to the the  carved channel. ...
  • Page 6 Step Ten Fix bottom plate with two long Screws.  Make sure that inserts point towards up.  Parts in use Step Eleven Install glides by fixing it using M6 screws.  Parts in use Step Twelve Install metal shelf holders on the both sides.  Parts in use...
  • Page 7 Step Thirteen Install shelves leaning on the metal holders. ...