Download Print this page

Advertisement

Quick Links

Installation and user manual
of demineralizer
Basic 5
IMPORTANT INFORMATION!
Strict quality tests are performed with our every demineralizer. After this process, the device is carefully
cleaned. It may happen that some water remain within the system, or packing marks are visible.
We apologize for this inconvenience and thank you for your understanding.
We also advise to perform rinsing cycle before first use. We also recommend it if the device has not been
used for several days.
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Basic 5 and is the answer not in the manual?

Questions and answers

Summary of Contents for HYDROLAB Basic 5

  • Page 1 Installation and user manual of demineralizer Basic 5 IMPORTANT INFORMATION! Strict quality tests are performed with our every demineralizer. After this process, the device is carefully cleaned. It may happen that some water remain within the system, or packing marks are visible.
  • Page 2 USER SAFETY NSTALLATION AND SERVICE EED WATER PARAMETERS OWER SUPPLY PARAMETERS DIMENSIONS GENERAL INFORMATION ELIVERY CONTENTS ERFORMANCE 2.2.1 MECHANICAL AND CARBON FILTRATION 2.2.2 EMINERALIZATION ON A MIXED ION EXCHANGE BED TECHNICAL SPECIFICATION MATERIALS INSTALATION EMINERALIZER INSTALLATION URNING ON THE DEMINERALIZER URN OFF THE DEMINERALIZER DEMINERALIZER OPERATION ONITORING FUNCTIONS...
  • Page 3 1. User safety Before using, please carefully read this manual containing information about safe installation, usage and maintenance. This manual should be kept in case of necessity to use it during the system performance. Symbol meaning 1.1 Installation and service ...
  • Page 4 1.2 Feed water parameters Hydrolab’s devices are intended for purifying tap water or initially purified water. Pressure – Basic demineralizer may be supplied with water of pressure from 4 bar (minimum) to 6 bar (maximum). If it is necessary, you should use a reduction.
  • Page 5 2.1 Delivery contents - Basic 5 demineralizer, with cartridges - Power supply cable 230V - Demi water faucet - sediment prefilter 5um 10” + housing key - connectors: tap - user manual - connection to a disinfecor / an autoclave (option) 2.2 Performance...
  • Page 6: General Information Before Installation

    2.2.2 Demineralization on a mixed ion exchange bed Filter H5 – filter contains beds of mixed ion exchange resins in ionic form H+/OHˉ situated in the housing. Water is purified on the deionization columns, where remaining mineral salts are captured. In the ion exchange process ions existing water and particles with a specified current are bound by ionites.
  • Page 7 Step 2 Supply valve installation. Due to the different local conditions, supply valve given by the producer has two reductions: ½” and ¾”. You should make sure, that the main water supply valve is closed and the water in the supply pipe is not under pressure. You should make sure, that the demineralizer is supplied with cold water.
  • Page 8 5.1 Turn off the demineralizer Procedures that shoud be performed when turning off the device: • Disconnect the device from the power supply. • Close the feed water valve. 5.2 Demineralizer operation Basic demineralizer works under the tap water pressure. Basic demineralizer is fully automated.
  • Page 9 6.2 Protection functions LEGEND: 1. TURN ON/TURN OFF 2. ENTER MENU 3. RETURN TO MENU 4. CURSORS 5. CONFIRM/SAVE 6. DISPLAY SCREEN 7. MANOMETER...
  • Page 10 1. Turn on/Turn off (1)  Device name/Date/Time  Conductivity/Temperature 2. Enter menu (2)  Select parameter  Module A replacement deadline* Select parameter ->Module A date  OK (5) Module A date 2014.03.15  Module A replacement deadline preview ...
  • Page 11 Select parameter ->Set clock  OK (5)  Edit and set date and time using cursors (4) Set clock 2015.03.22 09:30  Return to menu (3)  Down: service contact Select parameter ->Service inform.  OK (5)  Phone number, authorized service e-mail Call …………………….
  • Page 12 Step 3 Module A replacement • Open the back cover • Plug out the exhausted module A. • Connect a new module, check the flow directions • Close the back cover Step 4 • Open the feed water valve • Check if there are no leakages •...
  • Page 13 Step 3 • Check if there are no leakages. Step 4 The message „Replace H6module” disappears automatically, when the purified water conductivity goes below 20µS/cm. WARNING: After the resin replacement, the first 10 dm of purified water should be poured out to rinse the systems' connections, because it does not match the required parameters.
  • Page 14 10. Service book R - repair, M - maintenance, P - review date N/K/P procedures made by receiver...