Page 1
PHT tanks CCI Installation guide This guide provides information regarding the installation, operation, maintenance and warranty of the PHT tanks from Premier Tech Aqua. For additional information, contact our customer service at 1 800 632-6356. Table of content Technical Data ........................... 1 Components of the holding tank ....................
Page 2
Minimum 15 cm (6") in loose soil or Minimum 30 cm (12") in bedrock. Note regarding the bedding: Use 0-20 mm (0-¾") Ø gravel or sand well compacted and levelled. Premier Tech Aqua Installation guide – PHT tanks CCI Edition: 2019-01-09...
Page 3
MBBR, pumping station and equalization tanks must be ventilated using a pipe that is at least 100 mm (4") in diameter or that is connected to the dwelling’s ventilation pipe. Premier Tech Aqua Installation guide – PHT tanks CCI Edition: 2019-01-09...
Page 4
If you have any question or comments, do not hesitate to contact Premier Tech Aqua at 1 800 632-6356. The information contained in this document is based upon the latest information available at the time of publication and is designed to provide you with a general introduction to our products.
Need help?
Do you have a question about the PHT-390 and is the answer not in the manual?
Questions and answers