SolarEdge SEK-AU I Series Quick Installation Manual page 8

Three phase inverter with synergy technology
Table of Contents

Advertisement

15 cm
40 cm
10 cm
5 cm
100.8 cm
40 cm
Indoor Clearance
Outdoor Clearance
CAUTION! Do not block airflow
40 cm
114.5 cm
Maintaining Clearance
20 cm where annual average high temperature equals or above 25˚C
WARNING! Area
!
in front of the
inverter must be
kept clear for at
least one meter
Keep more than 10°
On mesh fence
On metal back sheet
Horizontal Installation
Back to back
30 cm
20 cm
MAN-01-00822-1.1
3
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sek seriesSek-au series

Table of Contents