Installation steps
Step 1
- Alignment of height-adjustable feet with spirit level.
- Slightly carve off concrete in siphon area, if necessary.
Step 2
- P ress the flat seal from above into the drainage outlet, press siphon body [7] from below onto the
drain and fasten tightly with the drainage valve [6] from above.
- Connect the sewage hose to the siphon body [7] and connect with in-house sewage system.
- Insert cleaning bit [5], press the cover [4] on.
Step 3
- The tub is to be aligned with vertical walls in a 90 degree angle by means of a spirit level.
- The joints are to be filled with silicone. Select type of silicone in accordance with construction
material used. Please mind curing times.
Allow 24 hours for silicone
to dry before first use.
Max. 150 kg
- 15 -
24
hours