Installation manual purpose and limitations This manual is intended to provide guidance only, the installation of the Rugged Interactive product will be under your control. You will be responsible for making sure, upon completion of the installation, it is safe to use.
1.2 - Order and Installation Checklist ☐ Contact the Rugged Interactive sales team or a partner / distributor to begin the process. Confirm the invoice and delivery address along with date required (lead time is at least 5 weeks), ☐...
Brightly lit targets which flash when a hit is registered along with fun sounds and a large scoreboard. Ballistics consists of a series of targets and a Scorebox with all cables supplied. It is quick and easy to install to any suitable structure.
If further information is required, please get in touch and we will be able to provide further information and guidance. 1.6 - Place Order To begin the order process with Rugged Interactive: Email: Sales@rugged-interactive.co.uk Or call the Sales Office:...
Tidy back loose cables that could become a tripping hazard. § Ensure that the playing area is clear. § Immediately inform Rugged Interactive for maintenance advice if you have concerns. Don’ts: § Do not wear shoes with leather soles or high heels.
Ballistics Installation and Instruction Manual: Safety Guidelines 2.2 In Play Safety Guidelines Please ensure you read the following points before using the equipment: This activity can be great fun, but it can also be dangerous. There is a risk of serious injury if care is not taken when using the equipment.
Page 9
Ballistics Installation and Instruction Manual: Safety Guidelines Don’ts: § No more than one active user on a single trampoline at any one time. § Do not attempt to use any of the equipment without undertaking instruction / training carried out by an appropriate instructor.
+44 (0) 1726 981 123 www.rugged-interactive.co.uk hello@rugged-interactive.co.uk Section 3 - Installation 3.1 - Parts List Please check off the received parts for the installation and alert Rugged Interactive immediately if anything is missing. ☐ Targets (to the quantity ordered, up to 16). ☐...
3.3 - Installation Overview Below is an overview of the steps needed to install Ballistics. More detail for the process is provided in the following pages. Please read through ALL of this prior to beginning the installation and if you are in any doubt, contact Rugged Interactive.
Page 14
Ballistics Order and Installation Manual: Installation Ballistics Display / Score Box (HUB) Installation Notes: § Fix HUB using any suitable self-tapping or wood screws into the surface material. The HUB can be recessed to be flush with the surface or affixed on top of the foam-backed vinyl if necessary.
Page 15
Ballistics Order and Installation Manual: Installation Ballistics Target Installation Notes: § Fix targets using any suitable self-tapping or wood screws into the surface material. § Note: Cables exit is at the base of the target box. Hold the main body in place, and ensure it is level.
Page 16
Ballistics Order and Installation Manual: Installation Ballistics Targets to Score Box (HUB) Installation Notes: § Attach correctly the supplied CAT5 cables from the targets to the designated output cables from the HUB. § Make sure the RJ45 connector is clear from dust and debris and do not force the CAT5 Cable into Connect the CAT5 cables from the targets to the Score Box (HUB).
Ballistics (Game / Program) – Battle, 2 minutes Game Rules: The objective of Ballistics is to score points by hitting the opposing team targets by using air cannons / balls. One (1) point is earned for any target hit. The targets are split into 2 even groups. Aim and shoot at the opponents’ coloured targets. They will flash and a noise will sound upon a successful hit.
Page 23
Power Supply Specification SPECIFICATION PRODUCT GSM60B12-P1J SAFETY MODEL NO. GSM60B12 DC VOLTAGE Note.2 RATED CURRENT CURRENT RANGE 0 ~ 5A RATED POWER (max.) OUTPUT RIPPLE & NOISE (max.) 100mVp-p Note.3 ±3.0% VOLTAGE TOLERANCE Note.4 ±1.0% LINE REGULATION Note.5 ±3.0% LOAD REGULATION SETUP, RISE TIME 1000ms, 30ms / 230VAC 1500ms, 30ms / 115VAC at full load...
Page 24
Power Supply Specification Derating Curve Static Characteristics (HORIZONTAL) ℃ AMBIENT TEMPERATURE ( ) INPUT VOLTAGE (VAC) 60Hz Mechanical Specification Case No. GSM60B Unit:mm ± U 2464 16AWG 1000 50mm for 5 ~ UL1185 16AWG 1500±50mm for 18 ~ 48V 31.5 POWER LED ±...
Page 25
PL31 2RQ +44 (0) 1726 981 123 www.rugged-interactive.co.uk hello@rugged-interactive.co.uk Ballistics Installation Checklist Please complete this checklist after any installation: Check 1: Pre-power up checks. Mounted into a wall or framework of a construction capable of supporting its weight and ☐...
Page 26
Ballistics Order and Installation Manual: System Specifications If anything unexpected occurs or problems persist after troubleshooting, call Rugged Interactive directly on +44 (0) 1726 833 882. * The volume can be adjusted on the score box. The volume control can be seen on the bottom edge of the score box.
Page 27
Next Steps Train team members Train your team members on how to use Ballistics, having knowledge of the gameplay will help them encourage users. Inspire them to cheer and celebrate with the customers when they achieve high scores. Maintenance General care and maintenance procedures for your Rugged Interactive product.
Page 28
Congratulations! Congratulations on your new Rugged Interactive product! Your customers are going to love this, and it is a great addition to your venue! If there is anything we can assist with or if you would be interested in information about any other Rugged Interactive products, then please do not hesitate to get in contact.
Need help?
Do you have a question about the Ballistics and is the answer not in the manual?
Questions and answers