highwood Home & Garden Hazleton Mailbox Post Assembly Manual

Advertisement

Quick Links

Home & Garden
Hazleton Mailbox Post
Assembly Guide

IMPORTANT!

DO NOT fully tighten the bolts until all bolts are started.
Once all bolts are inserted, go back & tighten all the bolts.

HARDWARE INCLUDED

A
FILL
21"
#7 x 3"
LEVEL
Ground level
18"
GRAVEL
For information on Care and Cleaning or to Register your
highwood product, please visit www.highwood-usa.com.
Qty: 6
CUSTOMER SUPPLIED TOOLS
Cordless screwdriver/drill OR
Multi-bit handle for the Torx Bit
IMPORTANT! Check for Underground
Services With Your Local Authorities
BEFORE Installation of This Product.
1) Dig a Hole Approximately 21" Deep. Fill The
Hole With Approximately 3" of Gravel At the
Bottom For Water Drainage.
2) Insert the Base of the Post Into the Hole and
Fill the Hole With Concrete or Packed Stone
Dust. Using a Hand level, Ensure the Post is
Plumb on All Sides

TOOLS INCLUDED

T-15 TORX BIT
MLBX1
08.03.2021
PAGE 1 OF 2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Home & Garden Hazleton Mailbox Post and is the answer not in the manual?

Questions and answers

Summary of Contents for highwood Home & Garden Hazleton Mailbox Post

  • Page 1 Fill the Hole With Concrete or Packed Stone Dust. Using a Hand level, Ensure the Post is Plumb on All Sides 18" 21" GRAVEL MLBX1 For information on Care and Cleaning or to Register your 08.03.2021 highwood product, please visit www.highwood-usa.com. PAGE 1 OF 2...
  • Page 2 Clearance Holes in Base and Align Seperately Per Instructions Included with Pilot Holes in Crossbar. Fasten with Mailbox. Using T-15 Torx Bit. MLBX1 For information on Care and Cleaning or to Register your 08.03.2021 highwood product, please visit www.highwood-usa.com. PAGE 2 OF 2...

Table of Contents