Afore SAPM-10KW Installation And Operation Manual

Afore SAPM-10KW Installation And Operation Manual

Zero injection smart meter

Advertisement

Zero Injection Smart Meter
Installation and Operation Manual
Building 7, No.333 Wanfang Rd, Minhang District, Shanghai, China. 201112

Advertisement

Table of Contents
loading

Summary of Contents for Afore SAPM-10KW

  • Page 1 Zero Injection Smart Meter Installation and Operation Manual Building 7, No.333 Wanfang Rd, Minhang District, Shanghai, China. 201112...
  • Page 2: Table Of Contents

    Contents 1. About This Manual ..... . 2. Parameter......3.
  • Page 3: About This Manual

    About This Manual 1. About This Manual Afore smart meter is an intelligent control device, which is designed for grid-connected inverters. Its main function is to measure the generation and consumption, transmit the data to the inverter through RS485 communication, to ensure that the generated power of the inverter is less or equal to the user’s load.
  • Page 4: Zero-Injection Connection

    Zero-injection Connection a. Single-phase Smart Meter b. Three-phase Smart Meter 3. Zero-injection Connection Note: 1. CAT5/CAT6 cable should be used between smart meter and inverter Maximum length of cable less than 300m 2. Meter connection on the inverter The meter needs to be connected to the inverter’s Zero-injection port (RJ45 terminal).
  • Page 5 Zero-Injection Wiring RJ45 Pin order for single-phase inverter (A)(B) 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 568B Standard 1. White green 5. White blue 2. Green 6. Orange 3. White orange 7.
  • Page 6 Zero-Injection Wiring Note: The distance between the inverter and smart meter is suggested sless than 100M. For the distance more than 100M, it needs to parallel a 120Ω resistor between 24A and 25B of the smart meter. Single-phase Smart Meter 24A 25B 24A 25B Three-phase Smart Meter...
  • Page 7: Connect The Smart Meter To Single-Phase System

    Connect the Smart Meter to Single-phase System 4. Connect the Smart Meter to Single-phase System 4.1 System Diagram RS485 Afore Simplex SAPM-10KW Meter PV GENERATOR HNS1000TL-1~HNS10000TL Inverter GRID ..Communication path Power path HOUSEHOLD CONSUMERS Note: When the load exceeds 10kW, a CT needs to be added, see the...
  • Page 8: Inverter Setting

    Connect the Smart Meter to Single-phase System 4.2 Inverter Setting Step 1 Step 2 Normal 1s Delay Afore New Energy Power=xx W UP/DOWN UP/DOWN Choose Function Enable Choose Setting Function Enable Setting safety Inverter Info UP/DOWN UP/DOWN Choose ON Choose password: 5432...
  • Page 9: Single-Phase System Wiring Diagram

    Single-phase Inverter Zero-Injection FAQ Step 3 Note: After activate "Zero Injection" function, please restart the inverter. 4.3 Single-phase System Wiring Diagram Afore Meter Inverter Load 5. Single-phase Inverter Zero-Injection FAQ a. After complete wiring between smart meter and inverter. The power P display on the smart meter will synchronize with inverter Pac display.
  • Page 10 Single-phase Inverter Zero-Injection FAQ b. If the Zero-injection function is not activated or communication cable is not well connected, the power displayed on the inverter is Pac=0W. POWER GRID FAULT 932. 2 ℃ INTemp = 35.1 Pac = DOWN Inverter Pac Single-phase Smart Meter c.
  • Page 11: Explanation Of Smart Meter Display Content

    Explanation of Smart Meter Display Content 6. Explanation of Smart Meter Display Content Page Content Description U 230. 0 Page1 AC Voltage I 5. 0 00 AC Current Page2 P 1. 1 00 AC Power Page3 FT 1. 0 00 Power Factor Page4 F 50.
  • Page 12: Connect The Smart Meter To Three-Phase System

    Connect the Smart Meter to Three-phase System 7. Connect the Smart Meter to Three-phase System 7.1 System Diagram a. Three-phase System with TAPM-50KW Smart Meter RS485 Afore Three-phase TAPM-50KW Meter PV GENERATOR BNT003KTL~BNT0025KTL GRID Inverter ..Communication path Power path...
  • Page 13: Three-Phase 3-25Kw Inverter Setting

    Connect the Smart Meter to Three-phase System 7.2 Three-phase 3-25kW Inverter Setting Step 1 Step 2 PPv: xxxW Afore New Energy PGrid: xxxW UP/DOWN UP/DOWN Choose password: 5432 Choose Run Param Run Param * * * * Prot Param UP/DOWN...
  • Page 14: Three-Phase 30-60Kw Inverter Setting

    Connect the Smart Meter to Three-phase System Step 3 Note : After activate "Meter" function, please restart the inverter. 7.3 Three-phase 30-60kW Inverter Setting Step 1...
  • Page 15 Connect the Smart Meter to Three-phase System Step 2 P(%) Power xx KW EDay xx KWh System Checking... 1s Delay 1s Delay 1s Delay 1s Delay EAll xx KWh >>>>>>>> ww.aforenergy.com State 5 8 11 14 17 20 23 28/8/2020 11:00 UP/DOWN selection UP/DOWN UP/DOWN...
  • Page 16: Multiple Inverter System Connection Setting

    Connect the Smart Meter to Three-phase System 7.4 Multiple Inverter System Connection Setting a. For Three-phase 3-25kW Setting PPv: xxxW Afore New Energy PGrid: xxxW UP/DOWN UP/DOWN Choose password: 5432 Choose Run Param Run Param * * * * Prot Param...
  • Page 17 Connect the Smart Meter to Three-phase System b. For Three-phase 30-60kW Setting P(%) Power xx KW EDay xx KWh System Checking... 1s Delay 1s Delay 1s Delay 1s Delay EAll xx KWh >>>>>>>> ww.aforenergy.com State 5 8 11 14 17 20 23 28/8/2020 11:00 UP/DOWN Choose UP/DOWN...
  • Page 18: Wiring Diagram

    Connect the Smart Meter to Three-phase System 7.5 Wiring Diagram a. Three-phase Smart Meter (TAPM-50kW ) Wiring Diagram RS485 Afore inverter Meter Load b. Three-phase Smart Meter (TAPM-130kW ) Wiring Diagram Load/inverter There are two faces P1&P2 on CT, P2 directs to inverter and load, P1 directs to AC.
  • Page 19: Current Ratio Setting

    Connect the Smart Meter to Three-phase System 7.6 CT Load capacity CT secondary Current ratio Accuracy Passing current heart turns 50/60KW 200/5 100KW 300/5 200KW 400/5 300KW 500/5 500KW 1000/5 600KW 1200/5 800KW 1500/5 2000/5 1.5WM 3000/5 4000/5 7.7 Current Ratio Setting Buttons description: "SET"...
  • Page 20: Three-Phase Inverter Zero-Injection Faq

    Three-phase Inverter Zero-Injection FAQ 8. Three-phase Inverter Zero-Injection FAQ 8.1 Three-phase 3-25kW Zero-Injection FAQ a. If the inverter operation normally and the smart meter wiring correctly, the phase active power value display on the smart meter will be synchronize with inverter power (PGrid) value display.
  • Page 21 Three-phase Inverter Zero-Injection FAQ -1. 0 53 PGrid: -1053W EtoGDay: 8505W Inverter Grid Power Three-phase Smart Meter d. If wiring order of the three phases on the smart meter is incorrect, the current values of the three phases displayed on the smart meter will be different, the two phases that are incorrectly wiring will be smaller than the third phase.
  • Page 22: Three-Phase 30-60Kw Zero-Injection Faq

    Three-phase Inverter Zero-Injection FAQ 8.2 Three-phase 30-60kW Zero-Injection FAQ a. If the inverter operation normally and the smart meter wiring correctly. The total active power value display on the smart meter will synchronize with inverter Total Pac (Pa+Pb+Pc) value display. POWER GRID FAULT...
  • Page 23 Three-phase Inverter Zero-Injection FAQ d. If the CT wiring order is incorrect with smart meter, the power on the smart meter and the inverter will display negative values. POWER GRID FAULT ISO Test -3. 5 89 -1079W -1084W -1426W ISONGb DOWN Three-phase Smart Meter Inverter Pac (Pa+Pb+Pc)
  • Page 24: Explanation Of Smart Meter Display Content

    Explanation of Smart Meter Display Content 9. Explanation of Smart Meter Display Content Display interface Note Total Active energy Positive active energy Reverse active energy Communication Protocol n1-9. 6 00 Baud Rate Communication address ---- Phase A Voltage Phase B Voltage Phase C Voltage Phase A Current Phase B Current...
  • Page 25: Trouble Shooting

    Trouble Shooting Display interface Note Phase A Power Phase B Power Phase C Power Power Factor Fa 1. 0 00 Phase A Power Factor Phase B Power Factor Phase C Power Factor 10. Trouble Shooting Fault Reason Solution · Wiring error ·...

This manual is also suitable for:

Tapm-50kwTapm-130kw