LAN connectivity The LAN connectivity works for the Frama Fx Series 7, 7.5 and 9. LAN connection Plug in the Power Adapter and wait until both status lights are Plug the LAN cable between the F-Link 2 and the customer...
Page 3
8.8.4.4 DNS 2: Then, click the Submit button Success Information Step 3: On Settings / IS/IN/IX enter URL Settings of F-Link 2 On- Line Services: chfr-MeterServices.link0-neopost.com Server Postal Core: chfr-MeterServices.link0-neopost.com Port number: On- Line Services: ukfr-MeterServices.link0-neopost.com Server Postal Core: ukfr-MeterServices.link0-neopost.com...
Page 4
Configuration of Fx Series franking systems Plug in the LAN cable to the Internet wall socket Plug in the LAN cable to the base and the Internet wall socket Power up the F-Link 2 Franking Systems Configuration Step 1: On the Franking Systems go to Supervisor Mode (Manger)
Page 5
Confirm with OK Congratulation! The F-Link 2 and the Franking Systems are successfully configured for Router mode. However, make sure the F-Link 2 is fully functional by performing a Postal Inspection and an OLS Generic call on the franking systems.
LAN Wireless connectivity The LAN Wireless connectivity works for the Frama Fx Series 7, 7.5 and 9. Connect by Wireless Wireless Plug in the Power Adapter and wait until the status lights are lit On your Mobile Phone, look in wireless setting for available networks.
Page 7
Next, enter the password of your WLAN and click „Connect“ After that, you should receive a success information Press OK Note: The WI-FI is activated if the green LED is lightnig The F-Link 2 is now connected to WI-FI. Now, the configuration of the franking machine will take place.
Page 8
Configuration of Fs Series 3 franking systems Plug the LAN cable between the F-Link 2 and the franking Wireless systems Power up the F-Link 2 if it‘s not already powered up Franking Systems Configuration On the Franking Systems go to Supervisor Mode (Manger)
The F-Link 2 is successfully setup once you see both green lights on Congratulation! The F-Link 2 and the Franking Systems are successfully configured. However, make sure the F-Link 2 is fully functional by performing a Postal Inspection and an OLS Generic call on the franking machine.
Remove the key from the PC. Step 3: Power off the F-Link 2 and insert the USB key into the USB port. Switch On the F-Link 2. Wait until the Wireless LED turns amber and the box has been reset.
Page 11
0° to 40° Humidity Operating: 20% to 80% Dimensions: 105 x 54 x 27 mn Protocols/Port: TCP/IP V4.0 TLS V1.2 / Port 443 Certificate: Public Key: RSA key, 2048 bits Frama AG XXXXX D02.00 - 10.21 Switzerland F-Link 2 User Manual...
Need help?
Do you have a question about the F-LINK 2 and is the answer not in the manual?
Questions and answers