STAUFF STA-CK-305 Instruction Manual

STAUFF STA-CK-305 Instruction Manual

Direct accumulator charging kit for usa gas valve

Advertisement

Quick Links

Direct Accumulator Charging Kit
for USA Gas Valve
STA-CK-305
INSTRUCTION MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the STA-CK-305 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for STAUFF STA-CK-305

  • Page 1 Direct Accumulator Charging Kit for USA Gas Valve STA-CK-305 INSTRUCTION MANUAL...
  • Page 2 Product Description STAUFF’s accumulator charging kit is designed to suit accumulators fitted with gas valve type USA 0.305” x 32 TPI. It allows for the verification, pressurisation and nitrogen gas bleeding of the accumulator. Pre-charge pressure can be easily checked by using STAUFF charging valve (1) which combines a bleed valve, safety pattern gauge and 0.305”...
  • Page 3 9. To ensure optimum efficiency and performance of the hydraulic circuit, the pre-charge pressure must be checked frequently. STAUFF recommends the pressure be checked initially at intervals of 1 month, 3 months and then 6 months after installation. Depending on the amount of loss of pressure (if any) over this time, a planned maintenance schedule for monitoring the pressure can then be put into operation (check annually).
  • Page 4 STA-CK-305 Connection Flow Chart Pre-Charging -Typical Installation Safety Pattern Pressure Gauge + Adaptor SMD-20-G1/4 Charging Valve High Pressure Gas Hose DN4 Optional Length: 2000 mm STAUFF Recommend Test 20 / 1/4” BSPP Connection the use of a Nitrogen Gas Regulator USA 0.305”...
  • Page 5 1. Recommendation: Before proceeding to any operation concerning the initial pressurisation of an accumulator, consult the applicable operating instructions. 2. Pressurisation limits: Ensure that the STA-CK-305 Charging Kit and any associated pressure gauge fitted are rated for the intended pressure for both pre-charging and pressure checking. Refer to the manufacturers specifications.
  • Page 6 Remove the accumulator gas valve protection cap and gas valve screw cap fitted to the gas side of the accumulator. Refer to page 4 for connection flow chart ▪ Ensure regulator used is fitted with STAUFF SKK-20 fitting ▪ Make sure main valve on nitrogen gas bottle is closed ▪...
  • Page 7 Prepare a container to catch any fluid which may drain from the fluid port during charging. Refer to page 4 for connection flow chart ▪ Ensure regulator used is fitted with STAUFF SKK-20 fitting ▪ Make sure main valve on nitrogen gas bottle is closed ▪...
  • Page 8 Tel.: +44 114 251 85 18 info@stauff.com.cn info@stauff.co.kr sales@stauff.co.uk MALAYSIA UNITED STATES FRANCE STAUFF South East Asia Sdn Bhd STAUFF Corporation STAUFF S.A.S. Tel.: +60 3 8024 61 68 Tel.: +1 201 444 78 00 Tel.: +33 2 54 50 55 50 sales@stauff.com.my sales@stauffusa.com...

Table of Contents