Advertisement

Quick Links

20825 BARLASSINA (MI) - via Machiavelli, 16
www.tecnoinoxsrl.it - info@tecnoinoxsrl.it

STEP 1

- Check the right position of the holes to fix the cover
POS.1 and the points to fix front stop POS.2
(View DRAWING 1)

STEP 2

- Fix on both side of cabinet the front stop in position
POS.2 with screws self-threading 3,5x20 TPS/CR

STEP 3

- Insert the cover using holes in position POS.1

STEP 4

- Screw until a space of 3-4mm n°4 screws self-threading
3,5x13 TC/CR and n°4 washers M4 using holes in POS.3 (View
DRAWING 1)
ASSEMBLY INSTRUCTIONS P-ONE
Screw self-threading
3,5x13 TC/CR
DETTAGLIO A
SCALA 1 : 1
POS. 2
POS. 1
POS. 2
Screw self-threading
3,5x20 TPS/CR
POS. 1
POS. 3
A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the P-ONE and is the answer not in the manual?

Questions and answers

Summary of Contents for Tecnoinox P-ONE

  • Page 1 20825 BARLASSINA (MI) - via Machiavelli, 16 www.tecnoinoxsrl.it - info@tecnoinoxsrl.it ASSEMBLY INSTRUCTIONS P-ONE STEP 1 - Check the right position of the holes to fix the cover POS. 2 POS.1 and the points to fix front stop POS.2 (View DRAWING 1) POS.
  • Page 2 20825 BARLASSINA (MI) - via Machiavelli, 16 www.tecnoinoxsrl.it - info@tecnoinoxsrl.it ASSEMBLY INSTRUCTION P-ONE VITE PER BLOCCAGGIO STEP 5 - Fix the steel back components using n°4 screws self- threading 3,5x13 TC/CR (Using holes in POS.4 of DRAWING 2). STEP 6...
  • Page 3 20825 BARLASSINA (MI) - via Machiavelli, 16 www.tecnoinoxsrl.it - info@tecnoinoxsrl.it ASSEMBLY INSTRUCTIONS P-ONE STEP 9 - Fix rails using screws fixed before in front panel and using n°2 viti M4x16 TC/CR to fix them to the back steel components. STEP 10 - Insert bins.

Table of Contents