Minimum Clearances - Viessmann P10 Installation And Service Instructions Manual

Solar-divicon and solar pump
Table of Contents

Advertisement

Preparing for installation
Connections and internal components
Shut-off valve and flow rate indicator
1
2
3
4
A
B
Fig. 5
Shut-off valve (adjusting screw)
A
1 Flushing
2 Draining
3 Flow rate regulation
4 Operating position (depicted in the diagram)
B
Flow indicator

Minimum clearances

Solar pump assembly to the right of the Solar-Divicon
300
PS10
P10
P20
PS20
900
Fig. 7
10
(cont.)
200
Checking the flow rate at the top edge of the float
l/min
35
30
25
20
15
10
5
Fig. 6
Solar pump assembly to the left of the Solar-Divicon
200
P10
PS10
P20
PS20
900
Fig. 8
300

Advertisement

Table of Contents
loading

This manual is also suitable for:

P20Ps10Ps20

Table of Contents