Sensata Dimensions ADI-24J11 Installation, Operation And Maintenance Manual

Led signal battery backup system

Advertisement

Quick Links

Form: 121984D
August 2008
LED Signal Battery Backup System
Installation, Operation and Maintenance Manual
ADI-24J11
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Dimensions ADI-24J11 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sensata Dimensions ADI-24J11

  • Page 1 Form: 121984D August 2008 LED Signal Battery Backup System Installation, Operation and Maintenance Manual ADI-24J11...
  • Page 2: Table Of Contents

    Table of Contents Section Description Page Safety Instructions …………………………………………………….. Warning Symbols ……………………………………………………………………….. Battery backup System Precautions ……………………………………………… Battery Precaution ……………………………………………………………………… Specifications ……………………………………………………………. System Physical Description …………………………..…………….. BBS Physical Description ……………………………………………………………… CMBPS-30ATR 511016-2 (Enclosed case) ……………………………………… CMBPS-30ATR 511016-1 (Open back panel) …………………………………. Installation ………………………………………………………………..
  • Page 3: Safety Instructions

    Safety Instructions Important: Read this manual before installation, it contains important safety, installation, and operating instructions. Save this manual and keep it in a safe place. 1.1 Warning and Danger Symbols: To reduce the risk of electrical shock and to ensure the safe operation of your Dimensions power inverter, the following symbols are used throughout the manual.
  • Page 4: Specifications

    Specifications Output Voltage: 120 VAC regulated (110 to 125VAC) Output Frequency: 60 Hz ± 0.05% Output Waveform: Pure sine wave, less than 3% THD ADI-24J11 Input Voltage: (VDC) 21 to 28 Operating Temperature: -37° to 74° C (-35° to 165° F) Efficiency: Up to 85% Other Design Features:...
  • Page 5: System Physical Description

    System Physical Description Section 3 3.1 BBS Physical Description FIGURE 1: BBS Module model ADI-24J11 physical description front and rear view...
  • Page 6 Input Breaker: Trips to protect utility power from a BBS short circuit. Output Breaker: Trips to protect the BBS from a load short circuit. Inverter Run Time Meter: Tells the total time the system has operated from batteries since the meter was reset. Meter Reset Button –...
  • Page 7: Cmbps-30Atr 511016-2 (Enclosed Case)

    (23) Battery Voltage Test Point: Attach voltmeter probes to check the battery voltage at the inverter. (24) Dry Relay Connector Board: Wiring connector board (25) Low Battery Voltage Potentiometer: Use to select the level of remaining useful battery capacity to trigger the low battery dry relay. (26) RS-232 Connector Port: Connects to a windows based PC for monitoring and controlling the BBS.
  • Page 8: Installation

    Installation Section 4 4.1 BBS Components: TABLE 1 Picture Part Number and Description Qty. The BBS module ADI-24J11 fits all NEMA controller cabinets. The lead wires and connectors are at front of the BBS module for easy access from the cabinet door.
  • Page 9: Mounting The Bbs

    4.3 Mounting the BBS 4.3.1 Mounting the BBS Module: Shelf Mounting: Mounting brackets are not required. a) Locate the keyholes at the right and left side of the chassis flanges. See BBS module footprint on Figure 3 below. b) Screw or bolt the keyholes using ¼ inch diameter screws. c) Make sure the BBS is firm and secure.
  • Page 10 Mounting the Manual Bypass Switch - 30A Transfer Relay (Open 4.3.3 frame 511016-1 and enclosed case 511016-2) a) Locate a secure and appropriate cabinet support shelf. b) Using the washers and bolts provided fix the combined manual bypass switch - 30A transfer relay as shown on Figures 5 below.
  • Page 11 80 Amp Fuse Anderson Connector Negative (-) Black wire Positive (+) Red wire Quick Connector 12 VDC Battery FIGURE 8: Absorbent Glass Mat (AGM) battery and quick connector battery cable...
  • Page 12 CMBPS-30ATR ADI-24J11 Batteries Cabinet door FIGURE 7 BBS components mounted in a Stand Alone Cabinet...
  • Page 13: Wiring The Bbs

    4.4 Wiring the BBS 4.4.1 BBS Module Wiring Grounding: No grounding connection required. External temperature compensation battery charger: The temperature- compensated battery charging system compensates over a range of 2.5 – 4.0 mV/°C per cell. The temperature sensor is external to the inverter/charger unit and comes with 2 meters (6’6”) of wire (3 meters or 9’9”...
  • Page 14 • NEU: Neutral 30ATR 451036 • GRD: Ground A.C. A.C. Transfer relay 2-pin connector MBPS 511015 Utility To From Input Relay Relay AC Out AC In Neutral White Ground Green FIGURE 8: AC wiring configuration MBPS and 30ATR...
  • Page 15: Dry-Relay Contact Wiring

    4.5 Dry-Relay Contact Wiring For units purchased by Caltrans, this section is not to be used, please follow the Caltrans wiring documentation for relay connections. Risk of electrocution may exist when working with the dry relay contacts. Please turn the BBS “Off”, make sure the manual bypass switch is set to “Bypass”...
  • Page 16 • NO: Normally open Black • C: Common • NC: Normally closed On Batt Relay A White Green Low Batt Orange Relay B Blue Brown Timer Yellow Relay C Connector Violet (Option 611241) FIGURE 9: Red Flash wiring configuration...
  • Page 17: Adjustments

    Adjustments Section 5 5.1 Remaining Battery Capacity Adjustment 40% Useful Remaining Battery Capacity Adjustment 5.1.1 The BBS module supplies full power backup until the battery capacity is depleted. The battery voltage will be at 21 VDC and the BBS module will automatically shut off with a “low battery”...
  • Page 18: Communications

    Communications Section 6 The front panel has a DB-9 female connector. This port allows the BBS system to be monitored and controlled using HyperTerminal (or other terminal emulation software) on a Windows based PC. Refer to section 6.2 Terminal Setup, for a tutorial of this interface.
  • Page 19 FIGURE 11 FIGURE 12 FIGURE 13 FIGURE 14 FIGURE 15 FIGURE 17 FIGURE 16...
  • Page 20 6.2.2 HyperTerminal Log File HyperTerminal is capable of logging the terminal session in a text file for later viewing or data transfer. To initiate a log file use the following steps. 1. From the Terminal Interface window click ‘Transfer’ menu then click ‘Capture Text’.
  • Page 21: Using The Bbs Communication Interface

    6.3 Using the BBS Communication Interface The Dimensions BBS Communications Interface, for simplicity, is only 1 level deep. This section describes the STATUS information entries and use of the UPS COMMANDS. Airpax Dimensions, Inc. MM, DD, YY HH:MM Traffic BBS Serial Interface (model number) (serial number) BBS STATUS BBS COMMANDS...
  • Page 22 6.3.2 Commands Set Time: Set the time in the following 24HR format hh:mm. Set Date: Set the date in the following format. mm/dd/yy. Status Update: Press to update the display with current BBS information. Reset Outage Meter: Resets both the internally stored Outage Counter and the external Outage Meter.
  • Page 23: Theory Of Operation

    Theory of Operation Section 7 7.1 Systems Description: 7.1.1 General Overview: Dimensions Battery Backup Systems (BBS) consists of four main components: The BBS module with a built-in battery charger, the manual bypass switch (MBPS), 30A transfer relay (30ATR) or the Combined Manual Bypass Switch (MBPS-30ATR), and two or four 12VDC AGM sealed batteries along with the DC and AC cable connectors.
  • Page 24 2) Standby Mode: External power (120 VAC, 60 Hz) is connected to the inverter through the MBPS and the 30ATR or the CMBPS-30ATR. The BBS module automatically senses and qualifies external utility power, switching the inverter “Off” and the battery charger “On”. All the loads attached to the BBS module output will operate directly from the external power line.
  • Page 25 7.1.8 System Block Diagram: Dry Relay Contact DIMENSIONS BATTERIES BBS MODULE RS232 Windows based PC CMBPS-30ATR 30ATR (Replaces both items) MBPS EXTERNAL POWER TRAFFIC LIGHT CONTROLLER • AC: Alternate Current • DC: Direct Current • 30ATR: 30-amp Automatic Transfer Relay •...
  • Page 26: Startup Procedure

    7.2 Startup Procedure 7.2.1 General: After correct installation the BBS may be activated. The BBS automatically switches to the standby mode any time a qualified external AC power source is present. The 30ATR is also always de-energized when qualified external AC power is present or when a fault in the inverter line is been detected.
  • Page 27: Maintenance & Troubleshooting

    Maintenance & Troubleshooting Section 8 To prevent current being withdrawn from the batteries that results in battery damage the inverter unit must be switched “Off” and the batteries must be disconnected from the inverter at the Anderson connector if the Manual Bypass Switch is in the “Bypass Mode”...
  • Page 28: Trouble Analysis

    8.2 Trouble Analysis: 8.2.1 General Troubleshooting: a) Inverter Troubleshooting Procedure: Isolate the BBS completely out of the external power by setting the MBPS to “Bypass Mode” and do the following: • Set the BBS module powers switch to “Off”. • Unplug the female and male connector cords coming out from the BBS module and from the 30ATR or the CMBPS-30ATR.
  • Page 29 TABLE 5 LED Indicator Problem Solutions 1 No LEDs • The BBS module is not • Check the in-line fuses for continuity. connected to the batteries. • Make sure the DC wires are clean and tight. • battery voltage • Check the DC voltage at the inverter DC input.
  • Page 30 8.2.2 BBS Module Troubleshooting Flow Chart No power output Low battery Overload Any LED What LED indicator indicator lights ? light? High temperature Check Battery Is the "Check Check for a shorted or defective Check the 80 amp Battery" LED battery.
  • Page 31: Parts List

    Parts List Section 9 Part Number Description 140056 Guard fan metal 140251 Chassis base 140252 Chassis Cover 141217-1 Swing out battery shelf 79AH 141226-1 Swing out battery shelf 105AH 141272 Mounting bracket - Right 141273 Mounting bracket - left 210095 RS-232 9-Position connector 210160 Temp.
  • Page 32: Electrical Interconnection

    Electrical Interconnection Section 10 Dry relay contact connector (Optional) Traffic Light Controller 120 VAC 60 Hz AC Input 2-pin connector Anderson Connector Fuse Transfer relay cable Temperature Compensated Cable CMBPS 12 VDC 12 VDC 12 VDC 12 VDC FIGURE 23 Wiring diagram including CMBPS-30ATR...
  • Page 33: Limited Warranty

    Limited Warranty Section 11 SHIPPING TERMS: F.O.B. St. Paul Minnesota. Freight prepaid and billed, subject to prior credit approval. MINIMUM ORDER: $50.00 Net Price LOSS OR DAMAGE: Loss or damage in transit is the responsibility of the carrier. Any claim should be filed with the delivering transport company.

Table of Contents