Page 1
Assembly Instructions STEP1 Place base on flat surface. STEP2 Place back frame on rear, STEP3 Insert sides STEP 4 Insert top STEP5 Place front frame on, Then screw Front and back frame with m5 screws STEP 6 Mount upright set (A) to matching holes using m6 cage nuts set. STEP 7 Insert front door using Ipin.
Page 4
2D – Dimensions Design illustrative purposes only, may vary based on product & design Sides...
Page 5
*Should you find that the door pin does not fit due to the powder coating, this is perfectly normal and requires minimal corrective effort. Step 1 – Inspect pin on the door Step 2- Clean Please use a Flat nose Pliers or similar tool to remove the extra powder coating from pin, This is achieved by gripping the pin and rotating in a circular motion,...
Page 6
The powder should come off with ease and the metal on the pin should now be visible. Well done, the door will now fit!
Page 7
Please note the cabinets have been strictly engineered as follows US2000-W2B = 2x US2000 Pylontech Batteries (Wall Mount) US2000-2B = 2x US2000 Pylontech Batteries US2000-4B = 4x US2000 Pylontech Batteries...
This manual is also suitable for:
Us2000-2bUs2000-4bUs2000-5bUs3000-w2bUs3000-2bUs3000-3b...
Show all
Need help?
Do you have a question about the US2000-W2B and is the answer not in the manual?
Questions and answers