Whalen WF24GVB Quick Start Manual page 2

Table of Contents

Advertisement

Available languages

Available languages

ASSEMBLY INSTRUCTIONS
Step 1:
Mark wall for vanity placement and note the location of the
water supply lines and drain on the back panel of vanity.
Step 2:
Move vanity (B) into proper place against the wall.
Step 3:
Install faucet, drain and supply lines (none included) to
vanity top (A) according to the instructions supplied with
those items.
v
1
v
2
B
v
3
3
ASSEMBLY INSTRUCTIONS
Step 4:
In case of uneven floors, floor levelers are provided at the
bottom of the vanity. If necessary, adjust floor levelers by
hand to correct tilting and/or level doors.
Step 5:
To mount the backsplash (C) to the wall, apply a thin bead
of silicone compound (not included) to the unpolished
back side and bottom of the backsplash (C). Position
backsplash (C) as shown onto vanity top (A) and against
the wall. Clean any excess silicone compound before
allowing to dry.
Step 6:
Removing the Drawer:
a. Unload the contents from the drawer.
A
b. Slide out the drawer as far as it will go.
c. Press the lever down on the right-hand track and lift the
lever up on the left track to release the drawer. Pull the
drawer out the rest of the way.
Replacing the Drawer:
a. Align the drawer guides with the receiving glides.
b. Hold the receiving glides firmly and insert the drawer guide.
NOTE: It is normal for the drawer to close tightly the first
time after it has been removed.
c. Push the drawer in completely.
v
4
v
5
Silicone
C
UP
A
v
6
4

Advertisement

Table of Contents
loading

Table of Contents