Installation Diagram - Vestil MEZZ-200 Instruction Manual

Mezzanine gate system
Hide thumbs Also See for MEZZ-200:
Table of Contents

Advertisement

Rev. 8/2/2018

Installation diagram:

Select a location for the mezzanine gate system that is close to the edge of the upper level. Assemble the gate
following the instructions on pages 8 and 9. Move the gate assembly into position and anchor it to the surface by
3
installing
/
" anchor bolts through the 4 bolt holes in each post mounting bracket. The length of the anchor bolts
8
should be determined by your building engineer.
Upper level
Lower level
Copyright 2018 Vestil Manufacturing Co.
MEZZ-200, MANUAL
Bottom
Side
gate
gate
Page 8 of 11
Top gate
7
39
/
in.
16
Post mounting bracket
3
/
"
8
anchor
bolt

Advertisement

Table of Contents
loading

Table of Contents