Mitsubishi Electric MSZ-FD50VA-E1 Service Manual page 39

Table of Contents

Advertisement

OPERATING PROCEDURE
6. Removing the horizontal vane motor
(1) Remove the nozzle assembly. (Refer to 4.)
(2) Remove the screws of the horizontal vane motor unit,
and pull out the horizontal vane motor unit.
(3) Remove the screws of the horizontal vane motor unit
cover.
(4) Remove the horizontal vane motor from the horizontal
vane motor unit.
(5) Disconnect the connector from the horizontal vane
motor.
7. Removing the indoor fan motor and the line flow fan
(1) Remove the panel (refer to 1.) and the corner box.
(2) Remove the sensor holder, the power monitor receiver
P.C. board holder, the electrical box (refer to 3.) and
the nozzle assembly (Refer to 4.).
(4) Remove the screws fixing the motor bed. (Photo 10)
(5) Loosen the screw fixing the line flow fan. (Photo 11)
(6) Remove the motor bed together with fan motor and
motor band.
(7) Release the hooks of the motor band. Remove the
motor band. Pull out the indoor fan motor.
(8) Remove the indoor coil thermistor from the heat
exchanger.
( ) Install the indoor coil thermistor (RT12) in its former
position when assembling it. (Refer to Photo 13)
(9) Remove the screws fixing the left side of the heat
exchanger. (Photo 12)
(10) Lift the heat exchanger, and pull out the line flow fan
to the lower-left.
Photo 13
MSZ-FD25/35
Indoor coil thermistor (RT12)
MSZ-FD50
Photo 9
Screws of the horizontal vane motor unit
Photo 10
Photo 11
Photo 12
Screws of the
left side of the
heat exchanger
39
PHOTOS
Screws of the horizontal
vane motor unit cover
Motor band
Screws of the
motor bed
Screw of the
line flow fan

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents