Download Print this page

Parts; Set Up - U.S. Jaclean Home Sauna Instruction Manual

Advertisement

PARTS

MAIN UNIT
Short Zipper
Support Rod
Holder
Long Zipper
STEAM GENERATOR
Steam Supply Hose
Outer Lid
Control Panel
Power Switch
WATERPROOF MAT
Slide Bar
Backboard
Back Zipper
Steam Intake
Connector
Support Rod
TOP COVER
FOLDING CHAIR
5

SET UP

1. STEAM GENERATOR SETUP:
a. Connect one end of the Steam Supply Hose into the Steam Generator.
b. Connect the other end of the Steam Supply Hose to the Steam Intake
c. Connector on side of Main Unit.
2. MAIN UNIT SETUP:
a. Unfold the Main Unit and pull both sides outward to their full extent.
b. Unzip the back zipper. Shift the slide bar to the center. Rezip the zipper.
c. Place the waterproof mat onto the bottom of the main unit.
d. If you would like to utilize the top cover, place it over the top of the main
unit. Then attach the adhesive binder on both sides.
e. Set up the folding chair and place it inside the main unit.
f. Sit down on the chair inside of the main unit. Pull up the support rods
on either side of the unit and insert their top ends into their respective
support rod holders. This action will expand the main unit to its full size.
g. To disassemble the unit, simply reverse the sequence of these steps.
Folded Chair
Fixed Support
Top Cover
Water Proof Mat
Support Rod
Steam Supply Hose
Steam Intake Connector
Slide Bar
Back Zipper
6

Advertisement

loading

This manual is also suitable for:

Usj-859