INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
9. Position fl ange cover so the
10. Rotate the fl ange cover
hole is over the screw fi xing
so the hole is positioned over
point. Secure the fi rst screw.
a new screw fi xing point.
12. Push fl ange cover over wall plate and insert fl ange button. Repeat for all other fi xing
points.
SYDNEY | MELBOURNE | BRISBANE | PERTH | AUCKLAND
4
Australia 1300 788 778 www.rba.com.au
11. Repeat until four screws
are securing the wall plate.
New Zealand 0800 722 111 www.rbagroup.co.nz
|
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
RBA Modular Rails
RBA4601-011, RBA4601-018, RBA4601-019
Sourced/ Supplied under QMS
SYDNEY | MELBOURNE | BRISBANE | PERTH | AUCKLAND
1
Australia 1300 788 778 www.rba.com.au
Model RBA Modular
Rails
Date
03/10/19
Supercedes all previous
New Zealand 0800 722 111 www.rbagroup.co.nz
|
Need help?
Do you have a question about the RAFFAELLO RBA4601-011 and is the answer not in the manual?
Questions and answers