Download Print this page

Paragon Pro Troll 2721 Operator's Manual page 5

Material handling cart

Advertisement

ASSEMBLY INSTRUCTIONS CONT.
Note: Assembly sequence requires lifting and positioning heavy components. Procedure
Parts Included:
Frame Tubes
Axle Frames
End Handle Section
8" Casters
Adjustable Side arms
(TROLL® 2721 When completed.)
may require two people.
4
3
2
6
4
Step 11:
Connect the two end handle sections to the
frame tubes as shown. Insert U-bolts and
secure with washers and nuts. Be sure U-bolts
are aligned square to the frame tubes at the
indicator marks as the nuts are tightened.
Step 12:
Slide in the adjustable side arms to one of
two positions. Pull down on the spring-load-
ed pin to allow movement. (Note: Outer
position of the side arms will allow 4' wide
material such as wall board to be centered
on the cart.)
Fasteners:
1/2" U Bolts
1/2" Flat Washers
1/2" Lock Washers
1/2" Hex Nuts
3/4" x 2" Bolts
3/4" Lock Nuts
3/8" x 1" Bolts
3/8" Lock Nuts
5/16" Flat Washers
20
40
40
40
2
2
24
24
48

Advertisement

loading