Gigabyte G292-Z24 User Manual page 29

Hpc server - 2u up 8 x gen4 gpu server (broadcom solution)
Table of Contents

Advertisement

4
1
2
7
2
9
3
3
1
8
• When installing the heat sink over the CPU, use T30-Lobe driver to tighten the 4 captive nuts in
sequential order (1g2g3g4).
• The screw tightening torque: 8 ± 0.5kgf-cm (17.0± 1.0 lbf-in)
- 29 -
System Hardware Installation

Advertisement

Table of Contents
loading

Table of Contents