Download Print this page

2C Displays Frame IT Installation Manual

Cinema flocked frame screen

Advertisement

Quick Links

Step 6
There is a locking latch on the bottom wall mount only. (Fig 16)
Up Bracket
Bottom Bracket
Secure Button
(Fig 16)
Step 7
Fix the mounts onto the wall separately. (Fig 17-18)
(For 95" - height (h) = 1260mm & 105" - height (h) = 1430mm).
Up Bracket
Bottom Bracket
(Fig 17)
Step 8
Hook screen onto the top mount and bottom mount. (Fig 19-20)
(Fig 19)
Step 9
To uninstall the screen, please press the latch towards the
wall to release bottom frame from bottom mount, then lift the
screen a little to release it totally from top and bottom groove
of the mounts. (Fig 21-22)
(Fig 21)
(Fig 22)
Happy Viewing!
Protecting Your Screen:
• Keep away from direct sunlight or
high temperatures.
• Examine both the front and back surfaces
h
before retracting into the case to make sure it is
free of dust, dirt, insects or other foreign matter.
(Fig 18)
• Use a soft brush or cloth to lightly remove any
foreign particles.
Cleaning Your Screen:
• Do not use any solvents, chemicals or abrasive
cleaners on the screen surface.
• Use a mild detergent with warm water to
remove any marks on the surface or
screen case.
• Always immediately dab the screen with a soft
cloth to avoid soap marks.
(Fig 20)
• Do not scrub the surface.
Warranty: 12 Months
For more information please go to
www.2cdisplays.com.au
2C_FrameIT_Cinema_Flocked_Mar11_v1.1
or call 1300 730 025
2C Frame IT Cinema
Flocked Frame Screen
Installation Manual

Advertisement

loading
Need help?

Need help?

Do you have a question about the Frame IT and is the answer not in the manual?

Questions and answers

Summary of Contents for 2C Displays Frame IT

  • Page 1 (Fig 19) (Fig 20) • Do not scrub the surface. Step 9 Warranty: 12 Months To uninstall the screen, please press the latch towards the wall to release bottom frame from bottom mount, then lift the screen a little to release it totally from top and bottom groove of the mounts. (Fig 21-22) 2C Frame IT Cinema Flocked Frame Screen For more information please go to Installation Manual www.2cdisplays.com.au or call 1300 730 025 (Fig 21) (Fig 22) Happy Viewing! 2C_FrameIT_Cinema_Flocked_Mar11_v1.1...
  • Page 2 Required (not supplied) Step 1 Step 4 Lay each section of the frames on a tidy flat surface. (Fig 1) Unfold screen fabric and insert the tensioning bars into the fab- ric grooves. (Fig 8-10) Horizontal Frame Vertical Frame Electric Drill 3 x Screws to suit Wall Screw Driver Level (Fig 1) (Fig 8) Step 2 Slide Fixing Lugs into grooves on the reverse side of frames. (Fig 2 - 3) Supplied Fixing Lug (Fig 9) (Fig 10) Step 5 Align fixing lugs and the eyelets provided on the fabric. Using the (Fig 2) (Fig 3) tensioning bar, pull fabric eyelets over the lugs. (Tip: Arrange Horizontal Frame (x 2) Corner Brackets Top Mount (x 1) horizontal tensioning bars first then side tensioning bars). Step 3 (x 4) & Vertical Frame (x 2)