KegLand G40 Instruction Manual

KegLand G40 Instruction Manual

With 4 x submersible pumps

Advertisement

Quick Links

G40 with 4 x Submersible Pumps Instruction Manual
G40
With 4 x Submersible Pumps
Instruction Manual
KL13499
KegLand Distribution PTY LTD
www.KegLand.com.au
www.KegLand.com.au
Last Updated 28/07/2021 3:15 PM
Page 1 of 11

Advertisement

Table of Contents
loading

Summary of Contents for KegLand G40

  • Page 1 G40 with 4 x Submersible Pumps Instruction Manual With 4 x Submersible Pumps Instruction Manual KL13499 KegLand Distribution PTY LTD www.KegLand.com.au www.KegLand.com.au Last Updated 28/07/2021 3:15 PM Page 1 of 11...
  • Page 2: Warranty

    G40 with 4 x Submersible Pumps Instruction Manual WARNING IF THE GLYCOL CHILLER HAS JUST BEEN MOVED DO TURN ON UNLESS THE GLYCOL CHILLER HAS BEEN STANDING UPRIGHT FOR 24 HOURS. FAILURE TO DO SO WILL VOID WARRANTY. STAND THE GLYCOL CHILLER IN THE...
  • Page 3 3. Check for any signs of damage which may have occurred during shipping Remove the top service cover of the G40 by removing the 4 screws holding it in place. Under this cover you will find an IEC cable, castor wheels and screws, brass push in fitting for the drainage pipe and an STC-1000 instruction manual.
  • Page 4 Attach hosing to the IN and OUT ports for each fermenter This G40 has 10mm barbs as standard for the inlet and outlet of each pump. 10mm ID x 15mm OD Heavy Duty Silicone Tube (KL18142) is suitable to be used with these barbs. Simply push the hose over the IN and OUT barbs under the temperature controller you wish to use and secure with a clamp.
  • Page 5: Fill The Reservoir

    G40 with 4 x Submersible Pumps Instruction Manual Fill the Reservoir The G40 can be operated with either just water in the reservoir or both water and glycol to reduce the freezing point of water. IMPORTANT: If you are only using water in the reservoir and not glycol then do not set the temperature of the reservoir below 2°C.
  • Page 6 G40 with 4 x Submersible Pumps Instruction Manual Changing the Reservoir Set Temperature on the STC-1000 1. Hold the ‘S’ button until F1 displayed on the screen. 2. Press ‘S’ again which will enter the temperature adjustment mode 3. Then simultaneously hold ‘S’ and the up/down button to alter the set temperature of the reservoir.
  • Page 7: Testing The System

    IN barb or run it to a fermenter and then back into the IN barb. 4. Plug the G40 in using the provided IEC cable and turn the red power switch on. 5. Turn the temperature controller on which is above the IN and OUT barbs being tested and set the temperature to 2°C (or a lower temperature than the ambient temperature).
  • Page 8 3. Run tubing from the outlet of the fermenter cooling coils back into the reservoir of the G40 4. Set the temperature on the G40 to -2°C (if using glycol) or to 2°C (if only using water in the reservoir).
  • Page 9: Maintenance

    G40 with 4 x Submersible Pumps Instruction Manual 5. Insert the temperature probe of the external temperature controller into the thermowell on your fermenter. 6. Set the temperature on your external temperature controller to your desired fermentation temperature. This will cycle the pump on and off to supply cold glycol solution only when the temperature of the fermenter increases above the set fermentation temperature.
  • Page 10 Step 3. Divert the active wire into the blade connects (terminals 4 and 5 shown below) Step 4. Plug both the G40 and heating device into mains power NOTE: This is the same process for all four temperature controllers. So repeat this step to wire multiple controllers in the same way.
  • Page 11: Warranty (Australia)

    G40 with 4 x Submersible Pumps Instruction Manual Warranty (Australia) The G40 with 4 x submersible pumps comes with a 12-month Warranty when sold in Australia. Warranty does not cover product failure as a result of installation or operating procedure not in accordance with installation and operating guidelines as described in the instruction manual.

This manual is also suitable for:

Kl13499

Table of Contents