Download Print this page
ION SEF100M21 Operation Manual

ION SEF100M21 Operation Manual

Heavy duty sewage pumps

Advertisement

Quick Links

SEF100-SEF200
Heavy Duty Sewage Pumps
I
ntroductIon
Thank you for purchasing an Ion
heavy duty sewage pump. Take the time to read the
instructions carefully before using this appliance. We
strongly recommend that you keep this instruction
manual in a safe place for future reference.
Check the nameplate for your pump's specification,
refer to the table list.
Be careful not to exceed the given specifications in
the use of your pump.
Each pump is individually factory tested to ensure
proper
performance.
instructions will eliminate potential operating problems
assuring years of trouble-free service.
Most accidents can be avoided by using common
sense.
IMPORTANT: Ion
Technologies is not responsible
®
for losses, injury or death resulting from failure to
observe these safety precautions, misuse, abuse
or misapplication of pumps or equipment.
Technologies
®
Closely
following
these
OPERATION MANUAL
Dated: 08/09/2016
Document Name: SEF100-SEF200_OM
M
& M
arks
eanIngs
CAUTION: Keep the pump equipment out of
the reach of children! Warns that the failure to
follow the directions given could cause serious risk to
individuals or objects.
WARNING: This sign warns the operator that
the failure to follow an instruction may damage
the pump and/or the system.
s
W
afety
arnIngs
CAUTION: Read these safety warnings first
before installing, servicing, or operating any
pump.
Before Installation
This manual contains important information for the safe
use of this product. Read this manual completely and
follow the instructions carefully. Reasonable care and
safe methods relating to the installation and operation
of this product should be practiced. Check local codes
and requirements before installation.
WARNING: Risk of Electrical Shock or
Electrocution. May result in serious injury or
death or fire hazard. Installer must disconnect all
electrical sources prior to installation, handling or
servicing. Only qualified personnel may install this
system. NFPA 70/National Electric Code (NEC) or
local codes must be followed. System must be properly
grounded according to NEC. Do not lift pump by power
cord.
WARNING: Risk of Fire or Explosion. Do not
smoke or use open flames in or around this
system. This system is not intended for use in
hazardous locations per NFPA 70 National Electric
Code. Do not pump flammable liquids. Consult factory
for optional equipment rated for hazardous location
use.
CAUTION:
amputation or severe lacerations can
result. Keep clear of suction and discharge
openings. DO NOT insert fingers into pump
with power connected. Risk of serious cutting or
Register your product at www.ionproducts.net
Page 1 of 12
Rotating
machinery,

Advertisement

loading

Summary of Contents for ION SEF100M21

  • Page 1 Check local codes and requirements before installation. Thank you for purchasing an Ion Technologies ® heavy duty sewage pump. Take the time to read the WARNING: Risk of Electrical Shock or instructions carefully before using this appliance.
  • Page 2 SEF100-SEF200 OPERATION MANUAL Dated: 08/09/2016 Heavy Duty Sewage Pumps Document Name: SEF100-SEF200_OM Page 2 of 12 amputation exists. Disconnect all power sources prior CAUTION: Rotating machinery, to servicing pump. Pump may start without warning. amputation or severe lacerations can result. Keep clear of suction and discharge CAUTION: Do not modify the cord and plug.
  • Page 3 SEF100-SEF200 OPERATION MANUAL Dated: 08/09/2016 Heavy Duty Sewage Pumps Document Name: SEF100-SEF200_OM Page 3 of 12 CAUTION: These pumps are NOT to be erforMance installed locations classified hazardous in accordance with the National Electric Code, ANSI/NFPA 70. WARNING: Do not introduce into any sewer, either directly, or through a kitchen waste SEF100 SEF200...
  • Page 4 Amps L3-3: Volts L3-3: PecIfIcatIons Nema Start Cord O.D. Model Volt Cord Size Cord Type Code Inches SOW/ 230/1 1750 10.8 14/3 0.55 SEF100M21 SOOW SOW/ SEF100M23 230/3 1750 14/4 0.59 SOOW SOW/ SEF100M03 208/3 1750 14/4 0.59 SOOW SOW/...
  • Page 5 SEF100-SEF200 OPERATION MANUAL Dated: 08/09/2016 Heavy Duty Sewage Pumps Document Name: SEF100-SEF200_OM Page 5 of 12 WARNING: Servicing should be performed PecIfIcatIons contInued only by an authorized service center. Description: Always disconnect the pump from power source To pump domestic, commercial and light industrial before handling or making any adjustments.
  • Page 6: Pre-Operation

    SEF100-SEF200 OPERATION MANUAL Dated: 08/09/2016 Heavy Duty Sewage Pumps Document Name: SEF100-SEF200_OM Page 6 of 12 Submergence CAUTION: Electrical Connections The pump should always be operated in the Turn circuit breaker off before plugging or submerged condition. The minimum sump liquid level unplugging the switch and/or pump.
  • Page 7: Troubleshooting

    SEF100-SEF200 OPERATION MANUAL Dated: 08/09/2016 Heavy Duty Sewage Pumps Document Name: SEF100-SEF200_OM Page 7 of 12 motor to run slow, resulting in motor overload. roubleshootIng Clear impeller. Pump does not run and/or just hums. Fuse blows or circuit breaker trips when pump 1.
  • Page 8 SEF100-SEF200 OPERATION MANUAL Dated: 08/09/2016 Heavy Duty Sewage Pumps Document Name: SEF100-SEF200_OM Page 8 of 12 xPloded escrIPtIon Part Numbers Number Quantity Description SEF100M 1Ø SEF200M 1Ø SEF100M 3Ø SEF200M 3Ø 091SWF101 091SWF201 091SWF231 091SWF231 POWER CORD 091SW1027 091SW1027 091SW1027 091SW1027 SCREW 091SW1028...
  • Page 9 SEF100-SEF200 OPERATION MANUAL Dated: 08/09/2016 Heavy Duty Sewage Pumps Document Name: SEF100-SEF200_OM Page 9 of 12 xPloded Register your product at www.ionproducts.net...
  • Page 10 SEF100-SEF200 OPERATION MANUAL Dated: 08/09/2016 Heavy Duty Sewage Pumps Document Name: SEF100-SEF200_OM Page 10 of 12 otes Register your product at www.ionproducts.net...
  • Page 11 SEF100-SEF200 OPERATION MANUAL Dated: 08/09/2016 Heavy Duty Sewage Pumps Document Name: SEF100-SEF200_OM Page 11 of 12 otes Register your product at www.ionproducts.net...
  • Page 12 Coverage and Term. Metropolitan Industries, Inc. (“Metropolitan”) warrants to the original purchaser (the “Buyer”) of each Ion® product (the “product”), that any part thereof which proves to be defective in material or workmanship within three (3) years from date of manufacture, will be replaced at no charge with a new or remanufactured part, F.O.B.