Do you have a question about the Dual Slot Cradle 2SC and is the answer not in the manual?
Questions and answers
Summary of Contents for Point Mobile Dual Slot Cradle 2SC
Page 1
PM85 Dual Slot Cradle (2SC) Quick Start Guide • For more details of PM85 and user guide, please refer to our website (www. pointmobile.co.kr)
Page 2
Package Contents 1. PM85 2SC 2. Power Receptacle 3. Connection Plug Cover 4. LED Indicator (Blue LED indicates the device has been detected.) 5. Connection Socket Cover 6. Holder 7. Screws 8. Power AC Cable 9. Power Supply <Caution> Always use 'Holder' for connecting multiple 2SC's. If cradles are connected without the 'holder', it may cause device malfunction.
Page 3
Connecting 2SC's for a 6SC 1. Take off the Connection Plug Cover. 2. Take off the Connection Socket Cover. 3. Connect the plug to the socket. 4. Fix the connected cradles in place by using screws to tighten the holder. 5.
Page 4
Regulatory For European Community Users We have included this bulletin to comply with Directive 2012/19/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 4 July 2012 on Waste Electrical and Electronic Equipment (WEEE). This product has required the extraction and use of natural resources for its production.
Need help?
Do you have a question about the Dual Slot Cradle 2SC and is the answer not in the manual?
Questions and answers