Upsite HOTLOK Switchfix SF001-PR3 Installation Manual

Upsite HOTLOK Switchfix SF001-PR3 Installation Manual

Advertisement

Quick Links

HotLok
Switchfix
®
Part Numbers
SF001-PR3
Each carton contains:
Switchfix adjustable chassis (1), Channel Arms (2), 10x32 Screws (6), Installation Guide (1)

Tools and Preparation Required for Installation

Tools Required:
Phillips Screwdriver
Hardware Required:
10x32 Cage Nuts (4-8), 10x32 Screws (4-8)

Specifications

Part Number
Passive, Switch Rear Intake,
SF001-PR3

Installation Precaution

Ensure the SwitchFix is installed
so that it does not limit the airflow
required for the safe operation of
the equipment.
Do not interfere with the switch
power cords when installing on a
live unit.
Take necessary precautions when
handling electrical components.
Description
1U, Adjustable, Black
Dimensions
10"-14.63" (254mm - 372mm)
REAR/HOT AISLE
Installation Guide
Quantity per
Carton
1
Shipping
Weight
21 lbs.
FRONT/COLD AISLE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HOTLOK Switchfix SF001-PR3 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Upsite HOTLOK Switchfix SF001-PR3

  • Page 1 Installation Guide HotLok Switchfix ® Part Numbers SF001-PR3 Each carton contains: Switchfix adjustable chassis (1), Channel Arms (2), 10x32 Screws (6), Installation Guide (1) Tools and Preparation Required for Installation Tools Required: Phillips Screwdriver Hardware Required: 10x32 Cage Nuts (4-8), 10x32 Screws (4-8) Specifications Quantity per Shipping...
  • Page 2 Installation Guide Installing the SwitchFix The SwitchFix channels mount to the rack rails with mounting screws and cage nuts (not included). The front face of the channels are attached to the rack rails using the top mounting holes and the bottom mounting holes will be used later in the installation process.
  • Page 3 If you have any questions, please contact us direct at improved. (505) 798-0200, or Toll Free at (888) 982-7800. Email us at info@upsite.com Maintaining Proper Cooling of Equipment Failure to follow computer manufacturer’s guidelines for maintaining proper cooling may result in the overheating of equipment.
  • Page 4 Limited Warranty Upsite Technologies, Inc. (the Company) warrants to the original purchaser that products delivered hereunder will be free of defects in materials and workmanship for a period of twelve (12) months from the date of purchase (the “Warranty Period”).

This manual is also suitable for:

Hotlok switchfixSf001-pr3

Table of Contents