CAC / BDP PG92SAS Installation, Start-Up, Operating And Service And Maintenance Instructions page 53

Single ---stage 4 ---way multipoise condensing gas furnace
Table of Contents

Advertisement

HORIZONTAL LEFT -
VERTICAL VENT CONFIGURATION
1
2
3
4
5
6
7
HORIZONTAL LEFT -
RIGHT VENT CONFIGURATION*
*Requires Accessory Internal Vent Kit
See Product Data for Current Kit Number
Attach vent pipe adapter with gasket to furnace casing.
Align notches in rubber coupling over standoffs on adapter. Slide clamps over the coupling.
Slide vent pipe through adapter and coupling into vent elbow.
Insert vent pipe into vent elbow.
Torque all clamps 15 lb.-in.
Attach combustion air pipe adapter with gasket to furnace.
Attach combustion air pipe to adapter with silicone. Pilot drill a 1/8-in.
hole in adapter and secure with a #7 x 1/2-in sheet metal screw.
Fig. 41 - - Horizontal Left (Appearance may vary)
HORIZONTAL LEFT -
LEFT VENT CONFIGURATION
53
A11340

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents