Outdoor Unit
1. Remove the control cover from the unit by
loosening the screw. Connect the wires to the
terminals on the control board individually.
2. Secure the cable onto the control board with
the cord clamp.
3. Refix the control cover to the original position
with the screw.
4. Use a recognized circuit breaker between the
power source and the unit. A disconnecting
device to adequately disconnect all supply
lines must be fitted.
Grade(Based on Cooling Capacity)
Circuit
Breaker
2.5~3.5kW(9~12kBtu/h)
(A)
15
Provide the circuit breaker between power
source and the unit as shown by
According to the confirmation of the above conditions, prepare the wiring as follows.
1. Never fail to have an individual power circuit specifically for the air conditioner. As for the
method of wiring, be guided by the circuit diagram posted on the inside of control cover.
2. The screw which fasten the wiring in the casing of electrical fittings are liable to come loose from
vibrations to which the unit is subjected during the course of transportation. Check them and make
sure that they are all tightly fastened. (If they are loose, it could cause burn-out of the wires.)
3. Specification of power source.
4. Confirm that electrical capacity is sufficient.
5. See that the starting voltage is maintained at more than 90 percent of the rated
voltage marked on the name plate.
6. Confirm that the cable thickness is as specified in the power source specification.
(Particularly note the relation between cable length and thickness.
7. Always install an earth leakage circuit breaker in a wet or moist area.
8. The following would be caused by voltage drop.
• Vibration of a magnetic switch, which will damage the contact point, fuse breaking, disturbance of
the normal function of the overload.
9. The means for disconnection from a power supply shall be incorporated in the fixed wiring
and have an air gap contact separation of at least 3mm in each active(phase) conductors.
20 Air Conditioner
5.3kW(18kBtu/h)
7.3kW(24kBtu/h)
20
30
Outdoor Unit
Connecting cable
Power cable
Main power source
Air
Conditioner
Terminal block
Over 5mm
Cover control
Circuit Breaker