Page 1
INSTALLATION AND CARE GUIDE 40” VENTO VERTICAL WALL CABINET E097014...
Page 2
VENTO 40” Vertical Wall Cabinet Model : E097014 Designed By: PININFARINA | ITALY PRE-INSTALLATION Tools Required Materials Included long screws set of wall cleats Materials Required 2x4 beam cut to size INSTALLATION SHEET ronbow.eu | ronbow.com 161019...
Page 3
Secure each wall cleat to the wall with the screws provided. See Figure 1. Step 4: Secure the cleat in the back of the cabinet to the wall cleat. Check if the wall cabinet is level. See Figure 2. INSTALLATION SHEET ronbow.eu | ronbow.com 161019...
Page 4
Locate the screw pictured in Figure 6. Turn the screw clockwise or counter- clockwise to move the door from top to bottom. See Figure 5. Height NOTE: When adjusting the door hinges keep in mind to adjust the other hinges. INSTALLATION SHEET ronbow.eu | ronbow.com 161019...
Page 5
These variations are considered to be the nature of the material in relation to their environmental exposure and may be significant over a long period of time. The effectiveness of cleaning Ronbow product is dependant on various factors that include sunlight, smoke, moisture, household cleaners and/or amount of cleaning product used over time.
Page 6
161019 40650 Encyclopedia Circle T 510.713.1188 Fremont, CA 94538 F 510.657.9388 ronbow.eu | ronbow.com...
Need help?
Do you have a question about the SIGNATURE Series and is the answer not in the manual?
Questions and answers