  • Page 1 CBS ArcSafe® RSA-23 (For Westinghouse DH) CBS ArcSafe, Inc. 2616 Sirius Road Denton, TX 76208 (940) 382-4411 www.cbsarcsafe.com...
  • Page 2: Installation

    RSA. These items may need to be removed or repositioned for proper RSA installation. Step 2: Place the RSA-23 over the serial plate and ensure the two locators are positioned flush with the serial plate escutcheon, as seen in the figure to the right.
  • Page 3 Step 3: Secure the RSA-23 to the breaker by turning the twist-to-lock handle on the magnet 180° clockwise. Verify that the trip rod is properly aligned with the trip switch, as seen in the figure to the right. The RSA-23 is now properly installed and ready for operation;...
  • Page 4 1.1 RSA-23 Adjustment Locations ATTENTION! To ensure the proper installation and operation of the RSA-23 and the switchgear, the RSA may need to be slightly adjusted to fit each cabinet. Step 1: If the shaft of the trip rod is failing to...
  • Page 5 Step 2: Remove the four pin threaded style cable from the RSO-I cord storage area and connect the cable to the corresponding plug on the RSA-23. ATTENTION! Please ensure that all cables are clear of moving parts. Failure to do so could damage cables and/or actuator.
  • Page 6: Included Components

    3.0 Included Components RSA-23 Component List CBS ArcSafe® Description Part Image RSA-23 Assembly Page | 6 RSA-23 Installation and Operation...
  • Page 7 RSA-23 Installation and Operation Page | 7...
  • Page 8 Federal, State, Local, and In-house safety regulations and procedures. Attention should be given to distance, angle, and personal protective equipment (PPE). Page | 8 RSA-23 Installation and Operation...