JJM Boiler Works NB Series Installation Operation & Maintenance

Acidic condensate ph treatment tank

Advertisement

Revised - September, 2016
NBSeries
Installation Operation
& Maintenance
Models: NBT-23
Acidic Condensate pH Treatment Tank
69 Ferry Street - Units 17 - 20
2400 Feather Sound Drive, Clearwater, FL 33762
jjmboilerworks.com
Easthampton, MA 01027 | 413-527-1893
413-427-3373

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NB Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for JJM Boiler Works NB Series

  • Page 1 Revised - September, 2016 NBSeries Installation Operation & Maintenance Models: NBT-23 Acidic Condensate pH Treatment Tank 69 Ferry Street - Units 17 - 20 2400 Feather Sound Drive, Clearwater, FL 33762 jjmboilerworks.com Easthampton, MA 01027 | 413-527-1893 413-427-3373...
  • Page 2: Application Restrictions

    series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance Overview What is pH? Read before proceeding The pH measurement of a fluid is an indicator of the acidity or Always use eye protection and plastic or rubber gloves when installing, recharging, adding water, or alkalinity.
  • Page 3: Installation

    series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance Installation 1. Remove Clear Cover machine bolt and nuts at both ends of cover. 2. Remove shipping bubble wrap and safely discard. 3. Remove “Date of installation label” and the “red warranty tag”. 4.
  • Page 4 NBT-23 pH Treatment Tank Ratings & Dimensions (in inches) (in inches) Flow Rating Flow Rating Active Ingredient/pH Power Pellets™ by JJM Boiler Works, Inc. Active Ingredient/pH Power Pellets™ by JJM Boiler Works, Inc. pH Treatment Tank/Single Unit Flow Rating Flow Rating Active Ingredient/pH Power Pellets™...
  • Page 5 series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance Piping Methods Do not install the NBT-23 in a vertical position. Only mount in a horizontal position on the floor or wall mounted horizontally using the mounting brackets provided. Figure 4 Piping for Single Heating Unit with Common NBT-23 pH Treatment Tank and Flue Drain Connection Figure 4 Piping for Single Heating Unit with Common NBT-23 pH Treatment Tank and Flue Drain Connection...
  • Page 6 series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance Piping Methods Figure 6 Piping for Multiple Heating Units with Common NBT-23 pH Treatment Tank. Common Flue Vent with Figure 6 Separate NBT-23 pH Treatment Tank. Piping for Multiple Heating Units with Common NBT-23 pH Treatment Tank. Common Flue Vent with Separate NBT-23 pH Treatment Tank Boilers / Hot Water Heaters / Furnace Common Drain Flue Drain...
  • Page 7: Maintenance

    Remove porous pellet bag from plastic shippig bag before placing in the NBT-23 tank. MSDS and MDS sheets are included with the NBT-23 units or can be found on the JJM Boiler Works, Inc. website @ www.jjmboilerworks.com 69 Ferry Street - Units 17 - 20 2400 Feather Sound Drive, Clearwater, FL 33762 jjmboilerworks.com...

This manual is also suitable for:

Nbt-23

Table of Contents