Do you have a question about the 6115S and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for ION 6115S
Page 1
Ionizing Blow-off Gun, refer to Ion Instruction Manual #19-6115. Installation Determine the location where you want to install the mounting stand. Ion recommends locating the stand on a work bench so that the nozzle of the gun is within 6" of the point of ionization.
Page 2
Stand. New products manufactured or sold by Ion are guaranteed to be free from defects in material or workmanship for a period of two (2) years from date of initial shipment. Ion’s liability under its new product warranty is limited to servicing (evaluating, repairing, or replacing) any unit returned to Ion that has not been subjected to misuse, neglect, lack of routine maintenance, repair, alteration, or accident.
Need help?
Do you have a question about the 6115S and is the answer not in the manual?
Questions and answers