Download Print this page
Daintree GE Current WOS2-WM Installation Manual

Daintree GE Current WOS2-WM Installation Manual

Wireless occupancy sensor

Advertisement

Quick Links

Daintree
®
Occupancy Sensor
(WOS2-WM)
BEFORE YOU BEGIN
Read these instructions completely and carefully.
Save these instructions for future use.
WARNING
Risk of electrical shock. Disconnect power before servicing or
installing product.
Install in accordance with National Electric Code and local codes.
The Daintree wall mounted Wireless Occupancy Sensor
(WOS2-WM) operates seamlessly within the Daintree Networked
wireless lighting control platform. The WOS2-WM is a battery-
powered occupancy sensor utilizing passive infrared (PIR) sensing
technology to detect movement. As part of the Daintree sensor
product line and using open, standards based ZigBee wireless
communications, the WOS2-WM reports real-time occupancy
events to turn on lights or keep them on when movement is
detected,and turn off lights when a space is vacant. The sensor's
off-delay timer is user-configurable from any location using
Daintree Controls Software (DCS) web application, eliminating
the need for on-site, manual sensor adjustment.
1
Installation Process
Keep the sensor lens clean. Avoid touching the sensor lens.
After first-time installation or reinstallation of a new
battery, allow up to three minutes for initialization.
Wireless
Infrared
Detection &
Test Mode LED
(red)
Network LED
(Green)
CAUTION
Risk of injury. Wear safety glasses and gloves during installation and
servicing.
1. Determine the mounting location for the sensor
based on the desired occupancy coverage.
See Placement for details.
2. Attach the mounting base to the wall in the
specified location.
3. Record the sensor's IEEE address and location
on the facility floor plan.
4. Install the batteries in the orientation (+ - ) shown on the
bottom of the battery compartments.
5. Attach the sensor's main unit to the ball socket on the
mounting base. Adjust the angle of the sensor, then hand-
tighten the collar to secure the angle.
6. After the batteries have
been installed for at
least 3 minutes,
initiate the Installation
Test Mode:
Momentarily press
the Utility button.
The green LED flashes
once, then the red LED
flashes each time the
sensor detects motion.
(The test mode times out
after 5 minutes.)
A. Walk test the sensor. Walk outside the coverage area
and wait for the red LED to stop flashing. Step inside the
desired coverage area and observe the red LED.
B. Repeat from various positions in the coverage area.
C. If necessary, adjust the sensor as described in
Adjustments: PIR Sensitivity. Repeat the walk test.
D. If you do not observe the proper behavior,
see Troubleshooting.
Installation Guide
WOS2-WM | DT106

Advertisement

loading

Summary of Contents for Daintree GE Current WOS2-WM

  • Page 1 See Placement for details. powered occupancy sensor utilizing passive infrared (PIR) sensing 2. Attach the mounting base to the wall in the technology to detect movement. As part of the Daintree sensor specified location. product line and using open, standards based ZigBee wireless 3.
  • Page 2 DCS web application. Joining the ZigBee Lighting Control Network After successfully completing the Installation Test the occupancy LED Operation sensor is ready to communicate with the Daintree Wireless Area Controller (WAC) and the Daintree DCS web-based lighting management user interface. For more information about Green LED: Description configuring the lighting control network, see the instructions Network Indicator and on-line help provided with the DCS application.
  • Page 3 Daintree Networked Wireless Occupancy Sensor (WOS2-WM) Installation Guide ® Placement (continued) The sensor is most responsive when crossing the field of view: The sensor is less responsive to radial movement: MORE RESPONSIVE Adjustments LESS RESPONSIVE Two trimpots on the back of the sensor are used to adjust the Daylight Hold-Off threshold and PIR motion sensor sensitivity.
  • Page 4 FCC Part 15 B, FCC ID: NRH-ZB-Z100B trigger sources. ICES/NMB-003 Class B, IC: 8984A-Z100B If lights do not turn Off after the WOS2-CM has Joined the Mounting (2) Screw holes on base plate; ZigBee network: ceiling mount; twist-lock sensor Check the “Off delay” for the zone in the Daintree • Controls Software. Dimensions 3.6” W x 2.8” H x 3” D Check for other DCS scheduled events or manual overrides • (92mm W x 70mm H x 77mm D) Weight that may be keeping the lights On.

This manual is also suitable for:

Dt106