DESCRIPTION PLAN Safety Precautions Machine Maintenance & Storage Machine Operation Parts List 6--11 Machine Operation (Chinese) 12-13 Wiring Diagram WHEN ORDERING PARTS * Use the 7,8 or 9 digit part numbers from the “part number” columns in this parts list. * Specify the model and serial number of the machine.
SAFETY PRECAUTIONS 3] When using machine: Do not run machine over cord. ! ! !This machine must be grounded ! Do not pull machine by cord or plug. Grounding provides a path of least Do not pull cord around sharp edges resistance electrical current.
Operation of Floor Machines * READ OPERATORS MANUAL To stop the machine at any time, simply release the operating trigger(s) THOROUGHLY PRIOR TO OPERATING OR and the machine will stop automatically. SERVICING THIS MACHINE. MAINTENANCE GENERAL USE To keep the machine performing well for 1.
Page 5
Directions for the grinding and crystallization processes. 1) Grinding process granular to finely granular. You can’t skip steps. There is coarse grind, Prepare the following tools and items: half-finishing grind and finishing grind, grinding disc holder, grinding disc During finishing grind, feel (usually the granularity is 300#.