VERDER CARBOLITE GERO VCF 12/23 Installation, Operation And Maintenance Instructions

1200 c vertical chamber furnace

Advertisement

Quick Links

Installation, Operation and Maintenance Instructions
1200 °C Vertical Chamber Furnace - VCF Model: 23 Litres
No Controller
VCF 12/23 + No Controller
MEN-VCF12023-005_NOCTRL
05-08-2019
(
)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CARBOLITE GERO VCF 12/23 and is the answer not in the manual?

Questions and answers

Summary of Contents for VERDER CARBOLITE GERO VCF 12/23

  • Page 1 Installation, Operation and Maintenance Instructions 1200 °C Vertical Chamber Furnace - VCF Model: 23 Litres No Controller VCF 12/23 + No Controller MEN-VCF12023-005_NOCTRL 05-08-2019...
  • Page 2: Table Of Contents

    Contents This manual is for guidance on the use of the Carbolite Gero product specified on the front cover. This manual should be read thoroughly before unpacking and using the furnace or oven. The model details and serial number are shown on the back of this manual.
  • Page 3 Calibration After-Sales Service Recommended Spare Parts and Spare Parts Kit 7.0 Repairs and Replacements Safety Warning - Disconnection from Power Supply Safety Warning - Refractory Fibre Insulation Temperature Controller Replacement Thermocouple Replacement Solid-State Relay Replacement Fuse Replacement Element Replacement 8.0 Fault Analysis Furnace Does Not Heat Up Product Overheats 9.0 Wiring Diagrams...
  • Page 4: Symbols And Warnings

    1.0   Symbols and Warnings 1.0 Symbols and Warnings Switches and Lights Instrument switch: when the instrument switch is operated the temperature control circuit is energised. Heat light: the adjacent light glows or flashes to indicate that power is being supplied to the elements. General Warnings DANGER –...
  • Page 5: Installation

    2.0   Installation 2.0 Installation Unpacking and Handling Note: throughout this manual the furnace lid is referred to as a "door". When unpacking and handling the product, always lift it by its base. Do not use the door or any other projecting cover or component to support the equipment when moving it. Use two or more people to carry the product where possible.
  • Page 6: Chimney

    2.0   Installation Depending on the application of the product, it may be appropriate to position it under an extraction hood. Ensure the extraction hood is switched on during use. Ensure that the product is placed in such a way that it can be quickly switched off or disconnected from the electrical supply.
  • Page 7: Electrical Connections

    2.0   Installation Electrical Connections Connection by a qualified electrician is recommended. All models covered by this manual may be ordered for single phase A.C. supply, which may be Live to Neutral non-reversible, Live to Neutral reversible or Live to Live. Check the product rating label before connection.
  • Page 8 2.0   Installation 2- or Black to phase 1 3-phase Black to phase 2 Black to phase 3 (except 2-phase) Light Blue to neutral (except delta) Green/ Yellow to earth (ground)
  • Page 9: Temperature Controller

    3.0   Temperature Controller 3.0 Temperature Controller If this product is fitted with a temperature controller, instructions are provided separately.
  • Page 10: 2132 Over-Temperature Controller Description (If Fitted)

    4.0   2132 Over-Temperature 4.0 2132 Over-Temperature Controller Description (if fitted) Description Alarm Light Page Scroll D Down Display This over-temperature controller is fitted and supplied ready to use by Carbolite Gero. It is a digital instrument with a latching alarm, requiring no additional panel controls. The controller features easy setting of over-temperature setpoint and reading of current temperature by the over-temperature sensor.
  • Page 11: Operation

    4.0   2132 Over-Temperature 4.2.2 Operation When switched on, the controller lights up, goes through a short test routine and then displays the measured temperature or the over-temperature setpoint. The page key allows access to parameter lists within the controller. A single press of the page key displays the temperature units, normally set to °C;...
  • Page 12: Audible Alarm

    4.0   2132 Over-Temperature Audible Alarm If an audible alarm is supplied for use with the over-temperature controller, it is normally configured to sound on over-temperature condition and to stop sounding when the alarm is acknowledged as given in section 4.2. Note: the alarm may sound during controller start-up.
  • Page 13: Operation

    5.0   Operation 5.0 Operation Operating Cycle This product is fitted with an instrument switch which cuts off power to the control circuit. Connect the product to the electrical supply. Turn on the instrument switch to activate the temperature controllers. The controllers illuminate and go through a short test cycle.
  • Page 14: Use Of Probes

    5.0   Operation Materials such as case hardening compounds and other reactive salts may penetrate the furnace chamber lining and attack the wire elements, causing premature failure. Use of Probes Any metal object used to probe into the product chamber while the product is connected to the electrical supply must be earthed.
  • Page 15: Power Adjustment

    5.0   Operation Power Adjustment The product control system incorporates electronic power limiting. Depending on the model and the destination country the power limit maybe set to 100% or a lower figure. Where appropriate the power limit parameter OP.Hi is accessible to the operator, but it should not generally be altered.
  • Page 16: Maintenance

    6.0   Maintenance 6.0 Maintenance General Maintenance Preventive rather than reactive maintenance is recommended. The type and frequency depends on the product use; the following are recommended. Maintenance Schedule CUSTOMER QUALIFIED PERSONNEL DANGER! ELECTRIC SHOCK. Risk of fatal injury. Only electrically qualified personnel should attempt these maintenance procedures.
  • Page 17 6.0   Maintenance Performance Element Circuit Electrical measurement Measure the current drawn on each phase / cir- Power Consumption cuit Hearth Visual check for fit and damage...
  • Page 18: Cleaning

    6.0   Maintenance 6.2.1 Cleaning Soot deposits may form inside the furnace, depending on the process. At appropriate intervals remove these by heating as indicated in the General Operation Notes. The product's outer surface may be cleaned with a damp cloth. Do not allow water to enter the interior of the case or chamber.
  • Page 19: After-Sales Service

    6.0   Maintenance thermocouple and temperature indicator should be made from time to time to determine whether full calibration is required. Carbolite Gero can supply these items. Depending on the controller fitted, the controller instructions may contain calibration instructions. After-Sales Service Carbolite Gero Service has a team of Service Engineers who can offer repair, calibration and preventive maintenance of furnace and oven products both at the Carbolite Gero factory and at customers’...
  • Page 20: Repairs And Replacements

    7.0   Repairs and Replacements 7.0 Repairs and Replacements Safety Warning - Disconnection from Power Supply Immediately switch the product off in the event of unforeseen circumstances (e.g. large amount of smoke). Allow the product to return to room temperature before inspection. Always ensure that the product is disconnected from the electrical supply before repair work is carried out.
  • Page 21: Thermocouple Replacement

    7.0   Repairs and Replacements Thermocouple Replacement The coverings and guards which must be removed to gain access to the thermocouple depend on the model, its orientation (horizontal or vertical), and possibly other options and fittings. It will usually be necessary to separate the product from its base or stand. On horizontal models one outer end-cap will need to be removed and on vertical models the terminal cover.
  • Page 22 7.0   Repairs and Replacements Replace any failed fuses with the correct type. For safety reasons do not fit larger capacity fuses without first consulting Carbolite Gero. The fuses are located at the cable entry point. Remove the back panel or control box back panel to gain access to the fuses.
  • Page 23: Element Replacement

    7.0   Repairs and Replacements Element Replacement See section 7.2 - wearing a face mask is required. The coverings and guards which must be removed to enable replacement of the wound tube element depend on the furnace model, its orientation (horizontal or vertical), and other options and fittings.
  • Page 24: Fault Analysis

    8.0   Fault Analysis 8.0 Fault Analysis Furnace Does Not Heat Up The HEAT The heating element Check also that the SSR is working light is ON has failed correctly The controller shows a The HEAT The thermocouple has broken or has very high temperature light is OFF a wiring fault...
  • Page 25: Product Overheats

    8.0   Fault Analysis Product Overheats Product only heats up The controller when the instrument shows a very high The controller is faulty switch is ON temperature The thermocouple may be The controller faulty or may have been shows a low removed out of the heating temperature chamber...
  • Page 26: Wiring Diagrams

    9.0   Wiring Diagrams 9.0 Wiring Diagrams WA-11-30 Connections below show single phase with indirect safety switch(es). F1, F2, F3 Fuses Filter R1/1, R1/2 Relay Contactor Relay Cables Temperature Controller Blue Control Thermocouple Solid State Relay GR/Y Green + Yellow Safety Switch Grey Heat Lamp Pink...
  • Page 27 9.0   Wiring Diagrams WA-11-31 Connections below show single phase with safety switches and over-temperature control. F1, F2, F3 Fuses Filter R1/1, R1/2 Relay Contactor Relay Temperature Controller Cables Over-Temperature Controller Blue Over-Temperature Thermocouple Control Thermocouple GR/Y Green + Yellow Solid State Relay Grey Safety Switch Pink...
  • Page 28 9.0   Wiring Diagrams WA-22-30 Connections below show 2-phase +N with indirect safety switches. F1, F2, F3 Fuses Filter R1/1, R1/2 Relay Contactor Relay Cables Temperature Controller Blue Control Thermocouple Solid State Relay GR/Y Green + Yellow Safety Switch Grey Heat Lamp Pink Element(s) Instrument Switch(es)
  • Page 29 9.0   Wiring Diagrams WA-22-31 Connections below show 2-phase +N with indirect safety switches and over- temperature control. F1, F2, F3 Fuses Filter R1/1, R1/2 Relay Contactor Relay Temperature Controller Cables Control Thermocouple Blue Over-Temperature Over-Temperature Thermocouple GR/Y Green + Yellow Safety Switch Grey Heat Lamp...
  • Page 30 9.0   Wiring Diagrams WA-33-30 Connections below show 3-phase +N with indirect safety switches. F1, F2, F3 Fuses Filter (if fitted) Controller Control Thermocouple Cables Relay Blue R1/1, R1/2, R1/3 Relay contactor Instrument Switch(es) Black Safety Switch GR/Y Green + Yellow Element Grey Solid State Relay...
  • Page 31 9.0   Wiring Diagrams WA-33-31 Connections below show 3-phase +N with indirect safety switches and over- temperature control. F1, F2, F3 Fuses Filter (if fitted) Controller Control Thermocouple Over-Temperature Controller Cables Over-Temperature Thermocouple Blue Relay R1/1, R1/2, R1/3 Relay contactor Black Instrument Switch(es) GR/Y Green + Yellow Safety Switch...
  • Page 32: Fuses And Power Settings

    10.0   Fuses and Power Settings 10.0 Fuses and Power Settings 10.1 Fuses F1-F3: Refer to the circuit diagrams. GEC Safeclip of the type shown Fitted if supply cable fitted. Internal (glass type F up to 16 A) Supply Fitted on board to some types 38 mm x 10 mm type F fitted on Fuses of EMC filter.
  • Page 33: Specifications

    11.0   Specifications 11.0 Specifications Carbolite Gero reserves the right to change the specification without notice. Chamber Size Approx Capacity (mm) Model Temp Power Weight (°C) (kW) (kg) Vertical chamber furnaces heated by resistance wire embedded in refractory cement slabs. VCF 12/23 1200 11.1 Environment...
  • Page 35 Notes Service Record Engineer Name Date Record of Work...
  • Page 36 The products covered in this manual are only a small part of the wide range of ovens, chamber furnaces and tube furnaces manufactured by Carbolite Gero for laboratory and industrial use. For further details of our standard or custom built products please contact us at the address below, or ask your nearest stockist.