Installing and Routing the Cables
1
Installing the PGND Cables
a
Installing the PGND Cables for the Cabinet
NOTE
When installing the PGND cables
in the DC powered OMB cabinet,
use the same method as that in
the AC powered OMB cabinet.
The ground cables and signal
cables must be bound separately
or must be separated from each
other for certain spacing to
minimize mutual interference.
The PGND cables are in yellow-
green color. The general ground
cable has a cross-sectional area
2
of 16 mm
.
b
Installing the PGND Cables for the RTN 910A
13
Ground bar