EarthLinked R-407C Installation Manual

Heating and cooling systems

Advertisement

SV-407-KIT (01/12)
EarthLinked
Service Valve Kit
and Adapter Kit
Installation Manual
for R-407C
Heating and Cooling Systems
CONTENTS
®
PAGE
3
5
Copyright 2012 Earthlinked Technologies, Inc.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the R-407C and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for EarthLinked R-407C

  • Page 1 ® EarthLinked Service Valve Kit and Adapter Kit Installation Manual for R-407C Heating and Cooling Systems CONTENTS PAGE Pre-Installation SV Kit Installation SV-407-KIT (01/12) Copyright 2012 Earthlinked Technologies, Inc.
  • Page 2 Disclaimer ® Proper installation and service of the EarthLinked Kit is essential to the Heating and Cooling ® Systems reliable performance. All EarthLinked systems and kits must be installed and serviced by an authorized, trained technician who has successfully completed the training class and passed the final examination.
  • Page 3 Pre-Installation Upon receipt of the service valve kit, carefully check the model number against the bill of lading. Next, check the service valve kit and adapter kit model numbers against the compressor unit model and line set sizes to ensure a match. See Figure 1. SVC.
  • Page 4 CONTINUED FROM PREVIOUS PAGE Figure 1. Service Valve/Compressor Unit/Line Set Match, continued ® Service valves are installed on the EarthLinked heating and cooling system earth loop line set near the compressor unit, to enhance serviceability of the compressor unit and earth loops.
  • Page 5 1. After ensuring the compressor unit and earth loop line set has no refrigerant or nitrogen holding charge, and after power has been turned “OFF” to the compressor unit and all other EarthLinked® and field supplied system components (at the appropriate breakers), remove the front and top panels of the compressor unit cabinet.
  • Page 6 Figure 3. Service Valve Orientation Figure 4. Service Valve Installed in Vapor Line 5. Cut the LIQUID line and repeat steps 3 and 4 except replace the service port cap on the LIQUID service valve. 6. Wrap a wet cloth around the VAPOR service valve nearest the joint to be brazed, as shown in Figure 5.
  • Page 7 Figure 5. Service Valve Wrap 7. Place a flame retardant heat shield between the joint to be brazed and the wet cloth. See Figure 6. Figure 6. Heat Shield SV-407-KIT (01/12) Page 7...
  • Page 8 8. Before brazing a joint with 15% silver content brazing alloy, connect a regulated nitrogen supply (step 2) to the charging port inside the compressor unit and flow nitrogen through the earth loop system and out the VAPOR service port until the oxygen in the braze joint area has been replaced by nitrogen.