HSS Hire 69105 Operating & Safety Manual

Electric chain hoist

Advertisement

Quick Links

GETTING STARTED

Double check that the hoist you have hired has a
sufficient Safe Working Load (SWL) for the item being
lifted.
Make sure that the hoist you have hired has a long
enough load chain.
Check and confirm that the suspension/anchorage
point is tested and certified to the equivalent (or
preferably greater) SWL of the hoist.
Visually inspect the hoist, paying special attention to
the condition of the chains and hooks.
Check that the lifting hook assembly has not been
looped between the chains. Looped chains will damage
the equipment and may cause the equipment to fail
during a lift.
Chains should be clean and free from dust, dirt,
moisture and grease. If the chain is gouged, twisted or
has distorted or damaged links DO NOT USE IT, return it
to HSS Hire.
Hooks MUST be distortion free and the
gate must return under spring load.
Allow a 10% safety margin to
accommodate dynamic forces that
may arise during the course of a lift.
To use an electric hoist first connect
the power supply to the fixed plug on
the unit. Either using a suitable fly
lead or alternatively, a loose end cable
drum (available for hire from your local
HSS Hire.
All the hoist controls are found on the
pendent. To raise a load press the
button with the up arrow. To lower a
load, press the button with the down
arrow.
There is a red emergency stop button
on the pendent, if pressed the hoist
will stop. To reset the button turn it
clockwise until it pops back out.

BASIC TECHNIQUES

Attach the hoist to a suitable tested suspension or
anchorage point, using the body hook. Make sure the
gate is correctly closed before proceeding.
Where the item to be moved has a dedicated lifting eye
this should be used.
If the item has no lifting eye, suitable slings/chains must
be used.
Before lifting, ensure the load is free and not restrained
by fixings etc.
Determine the loads weight and centre of gravity as
accurately as possible.
Attach suitable slings / chains to the load and attach to
the lifting hook ensuring the hook is not overcrowded
and that the hooks gate closes correctly.
Lift the load a nominal distance to check balance and
security of the load.
Use tag lines to control long or bulky loads.
Once raised lower as soon as possible. DO NOT leave the
load suspended or unattended for any reason.

EQUIPMENT CARE

Never push the equipment beyond its design limits. If it
will not do what you want with reasonable ease and speed,
assume you have the wrong equipment for the job. Contact
HSS Hire for advice.
Keep the equipment clean - you will find this less of a
chore if you clean it regularly, rather than wait until the end
of the hire period.
When not in use, store the equipment somewhere
clean, dry and secure.

FINISHING OFF

Lower any raised load and detach from the lifting hook.
Detach the hoist from its suspension point and
disconnect from the power/air supply and place in the
case provided ready for return to HSS Hire.
... have you been trained
The law requires that personnel using this type of equipment in
the workplace must be competent and qualified to do so.
Training is available at HSS Training
0845 766 7799
...any comments?
If you have any suggestions to enable us to improve the
information within this guide please e-mail your comments or
write to the Safety Guide Manager at the address below
e-mail: safety@hss.com
©HSS Hire Service Group Ltd 2020 No. LS64/02
76 Talbot Road, Old Trafford, Manchester, M16 0PQ
www.hss.com
Operating & Safety Guide LS64
Operating & Safety Guide LS64
Electric Chain
Electric Chain
Hoist
Hoist
Electrically operated hoists, simple to
install and easy to operate.
Code 69105/7/8/9/12/13/14/16/22/26/32
LS64/02
LS64/02

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 69105 and is the answer not in the manual?

Questions and answers

Summary of Contents for HSS Hire 69105

  • Page 1 Allow a 10% safety margin to disconnect from the power/air supply and place in the accommodate dynamic forces that case provided ready for return to HSS Hire. may arise during the course of a lift. To use an electric hoist first connect the power supply to the fixed plug on the unit.
  • Page 2 To reduce the risk of electric shock, always use a SAFETY WARNING suitable RCD (Residual Current-Operated Device) This equipment MUST NOT be used to carry or lift available from your local HSS Hire. personnel. Ensure the power socket is switched OFF before plugging into the power supply.
  • Page 3 Know Your Symbols HSS have created clear Icons to inform the hirer of Know Your Symbols HSS have created clear Icons to inform the hirer of their responsibilities towards the safe use of hire equipment. their responsibilities towards the safe use of hire equipment. These are designed to reduce the amount of different safety These are designed to reduce the amount of different safety information labels required for each product for hire.

This manual is also suitable for:

691076910869109691126911369114 ... Show all

Table of Contents