6.)
Raise the boom to the full upright position by pulling lever #3. The trencher will now have its weight on wheels and
tow bar. Turn the engine off.
7.)
Install the up-down and sided-to-side travel pins that were removed earlier. Relieve system pressure by pushing
lever #3. This will make the boom drop until it rests on the up-down travel pin.
8.)
Insert outriggers in the vertical brackets above the newly installed wheels. Lock the outriggers in the vertical position
with the pins and pin clips provided.
9.)
Roll the trencher away from the remaining packaging materials
Unpacking
1
.
4
2
3 4
fig01384