.
3
Installing the Product
Configuration
Anchor points per rack
Multiple Racks
2 (Front)
(Side-to-Side
not rated for seismic event
and Rear-to-
4 (All) – Telcordia Zone 4
Rear)
Two anchor points (not rated for seismic event)
Two anchor points (not rated for seismic event)
Figure 3-3: Clearance Distance for Multiple Rack Frames Installed Side-by-Side
22
Clearance Distance (mm)
Side (end)
Side (adjacent)
0
0
Workable distance
0
(800 recommended)
Four anchor points (Telcordia Zone 4)
Figure 3-2: Clearance Distance for Single Rack Frame
Four anchor points (Telcordia Zone 4)
Rear
Front
0
Workable distance
(1000 recommended)
Workable distance
Workable distance
(800 recommended)
(1000 recommended)
English 8/2020. Rev 0.3