Download Print this page

Hardware Installation - RC Groups North American P-64 SEMFF Combat Plane Build Manual

Advertisement

Hardware Installation

• Make up or install purchased control horns in elevator
and ailerons
• Make up pushrods and install
• Mount motor
• Position Rx and ESC
• Locate battery position for correct CG. See next page for
CG location.
• Then remove battery, ESC, motor, and Rx to paint if so
desired. A template has been provided in the plans for
the canopy lines.
• Additional panel lines were obtained from a 3-view
available online. Though not needed they do add a level
of detail that gives an extra special touch.

Advertisement

loading