Summary of Contents for Feeney Feeney DesignRail 24V LED Lighting V2,
Page 1
Rev: 09/21 DesignRail 24V LED Ligh ng (v2) ® Installa on Instruc ons General Notes: Drivers are available in a variety of wa ages. In general a driver should not exceed more than 80% of its rated output capacity. (Example: 60W Driver = 60 x 0.8 = 48W Max). Strip Lights require 1.44 wa s per foot.
Step 1 - Install Drivers Step 1A – Connect Source Power to Driver IMPORTANT SAFETY NOTE: TO REDUCE RISK OF ELECTRICAL SHOCK, TURN OFF AC CIRCUIT BREAKER PRIOR TO COMMENCING ANY ELECTRICAL WORK AND CONNECTING DRIVER(S) TO AC POWER SOURCE. VERIFY THAT LIVE POWER IS NOT PRESENT AT JUNCTION BOX WHEN MAKING CONNECTIONS. Determine loca on of driver.
Page 4
Step 1B - Drill Posts and Route Starter Cable Determine the post that will act as the star ng post, this will likely be designated on the ligh ng layout schema c received with the order. Installing the starter cable through the post is easiest when 1/2"...
Page 5
Step 1B - Con nued TOP OF POST For systems with ligh ng installed into Series 150 top rail: Drill an 11/16” diameter hole ver cally centered between the 1-3/16" factory pre-drilled top rail RCB holes. This will allow the light strip and connector to pass through the RCB hollow (See Figure Repeat this step for each post which will have light strips...
Page 6
Step 2 - Prepare Railing Frame Following driver installa on, and a er rou ng the starter #10 x 3/4" SCREW cable, install all posts and top rail per DesignRail Installa on 3/4" WIDE PIECE Instruc ons. OF STANDARD TOP RAIL INFILL FOR CABLERAIL For systems with ligh ng installed into Series 200, 300, 350, or...
Page 7
Step 2 - Con nued For systems with ligh ng installed into Bo om Rail: Measure opening between the post faces beneath the bo om rail (See Figure 2.5) Cut channeled bo om rail inert to fi t between posts. MEASURE Trim channel por on of isert at both ends to clear RCBs.
Page 8
Step 3 - Install Light Strips Measure length of strip light needed for run (face of post to face of post). Reference ligh ng layout for approximate light strip engths. Cut light strip to length at nearest cut mark. Cut marks are located approx.
Page 9
Step 3 - Con nued Peel back the adhesive tape protec ve layer about 6 to 12 inches, enough to begin s cking the light strip to the underside of the channel. Stuff starter cable and connector back into post, so that light strip starts as close to the face of the post as possible.
Page 10
Ligh ng in Series 200, 300, 350 or 450 Top Rail and Bo om Rail Details Intermediate Post with Series 200, 300, 350 or 450 top rail Stair Newel Post with Series 200, 300, 350, 450 top rail and and bo om rail bo om rail on level and Series 150 and bo om rail on stairs Single Corner Post with Series 200, 300, 350, 450 top rail Double Corner Post with Series 200, 300, 350, 450 top rail...
Page 11
Ligh ng in Series 150 Top Rail Details Intermediate Post with series 150 top rail Single Corner Post with Series 150 top rail Double Corner Posts with Series 150 top rail Stair Newel Post with Series 150 top rail At the exposed termina on end of the light strip, where no more connec ons will be made roll back the adhesive tape.
Page 12
Step 4 - Install Diff user Lens For systems with ligh ng installed into Series 200, 300, 350, or 450 top rail: Measure the opening between the picket and post face on each MEASURE MEASURE side of the picket . These dimensions should be (See Figure 4.1) equal.
Page 13
Step 4 - Con nued For systems with ligh ng installed into Bo om Rail: Measure opening between the post faces beneath the bo om rail (See Figure 4.5). Cut diff user lens to length, using a sharp u lity knife, or heavy duty u lity scissors/shears.