Sydney Opera House (Australia): Assembly Instructions
http://www.canon.com/c-park/en/
View of completed model
*This model was designed for Papercraft and may differ from the original in some respects.
Assembly Instructions: Six A4 sheets (No.1 to No.6)
*Build the model by carefully reading the Assembly Instructions, in the parts sheet page order.
*Hint: Trace along the folds with a ruler
and an exhausted pen (no ink) to get a sharper, easier fold.
Assembly Instructions
Mountain fold(dotted line)
Make a mountain fold.
Valley fold(dashed and dotted line)
Make a valley fold.
Scissors line(solid line)
Cut along the line.
Cut in line(solid line)
Cut along the line.
Scissors, set square, glue(We recommend stick glue), pencil, used
Tools and materials
ballpoint pen, toothpicks, tweezers, (useful for handling small parts)
Before gluing, crease the paper along mountain fold and valley
Assembly tip
fold lines and make sure rounded sections are nice and stiff.
Glue, scissors and other tools may be dangerous to young children
Caution
so be sure to keep them out of the reach of young children.
Before starting assembly:Writing the number of each section on its back side before
cutting out the sections is highly recommended.
(* This way, you can be sure which section is which even after cutting out the sections.)
Glue
The glue spot(colored dot)
shows where to apply the glue.
Glue spot(Red dot)
Glue parts with the same number together.
Glue spot(Green dot)
Glue within the same part.
Glue spot(Blue dot)
Glue to the rear of the other part.
1
®
Canon
is a registered trademark of Canon Inc.
( 1 ) Build the base.
1
4
5
Insert.
7
©
Canon Inc.
©
A & A Co., Ltd.
Indicates where sections
should be glued together.
2
6
8
3