Page 1
INSTALLATION FOR MORE TECHNICAL INFORMATION CONTACT US AT: MINIMUM 25 mm (0.98") • Place the Shark Base with the side opposite the C-shape nailing bar a minimum 25mm (1”) from the working edge FASTENING TO • At the back of the Shark Base hammer four (4) nails at "...
Page 2
With the Shark Base in the desired position, mark the hole location CONCRETE (CONCRETE ANCHOR OPTION) between the nailing bar and the timber post holder on the concrete • Drill and anchor the Shark Base with a 3/8” diameter anchor with a minimum 75 mm (3”) embedment • Anchor Options: •...