MaxPower CT60-IP Installation Operation & Maintenance

MaxPower CT60-IP Installation Operation & Maintenance

Ignition protected thruster with electronic thruster control

Advertisement

CT60-IP / CT80-IP
Ignition Protected Thruster
With electronic thruster control
CERTIFIED ISO 8846
INSTALLATION OPERATION MAINTENANCE
Serial No.: ------------------------------------------------------
Installation date: -------------------------------------------------
THIS MANUAL MUST BE KEPT ONBOARD AT ALL TIMES
Via Philips 5, 20900 Monza (MI), Italy
Tel. +39 039 200 1973-936 - Fax +39 039 2004299
www.max-power.com
E-mail:contact@max-power.com
www.max-power.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CT60-IP and is the answer not in the manual?

Questions and answers

Summary of Contents for MaxPower CT60-IP

  • Page 1 CT60-IP / CT80-IP Ignition Protected Thruster With electronic thruster control CERTIFIED ISO 8846 INSTALLATION OPERATION MAINTENANCE Serial No.: ------------------------------------------------------ Installation date: ------------------------------------------------- THIS MANUAL MUST BE KEPT ONBOARD AT ALL TIMES Via Philips 5, 20900 Monza (MI), Italy Tel. +39 039 200 1973-936 - Fax +39 039 2004299 www.max-power.com...
  • Page 2: Table Of Contents

    Contents Section Title Page General installation guidelines Tunnel Composite motor support and drive leg Electric Motor Propellers Protection grills Electrical installation Main power fuse Batteries Electronic control box Control panel and thruster control box functions Control panel installation Tests Electrical measurements Operation Alarms or thermal switch-off Safety...
  • Page 3: General Installation Guidelines

    For the CT60-IP mono, the propeller must be centred in the tunnel. In the case of the CT80-IP duo, the drive leg must be centered in the tunnel In no case should the propellers of either models protrude out of the tunnel.
  • Page 4: Tunnel

    2. TUNNEL Once the final tunnel position has been determined and all dimensions have been checked, mark the centre-point of the tunnel on both sides of the hull and drill holes of 8 –10 mm ∅ on either side. Using a metal rod, construct a compass with a 100mm radius. Insert through the holes and trace the ellipses, as shown below.
  • Page 5: Composite Motor Support And Drive Leg

    SUPPORT WILL BE FIXED. 3. COMPOSITE MOTOR SUPPORT AND DRIVE LEG For the CT60-IP (Mono): The propeller must be at the center of the tunnel. The motor support and the drive leg will therefore not be centered in the tunnel.
  • Page 6: Electric Motor

    positioning and then tightening the two 8mm ∅ screws alternatively using a 5.5mm Allen key (maximum torque: 25Nm). Check that the propellers rotate freely, without resistance or friction. It is imperative that the holes and the screws remain free of sealing compound, otherwise there is a risk of an incorrect assembly of the parts.
  • Page 7: Main Power Fuse

    These values are given as an indication, assuming that the batteries are charged at 100% and in charge, that is either 13.8V or 25.4V. The performance data of the CT60-IP / CT80-IP is measured with an approx. consumption of 400A and 11V (12V) or 280A and 22V (24V) at the motor’s connections.
  • Page 8: Electronic Control Box

    10. ELECTRONIC CONTROL BOX WARNING: The electronic controller must be positioned outside of the zone at risk in which there may be potentially flammable gases. Install a fused circuit breaker / switch in the boat's main DC distribution panel marked BOW THRUSTER.
  • Page 9: Control Panel Installation

    12. CONTROL PANEL INSTALLATION Control panels should be protected from the natural elements while the thruster is not in use. Install the control panel(s) in easily accessible positions, without obstructing the main engine and/or steering controls. When fixing the panel with the stainless steel screws, make sure to install the pre-cut rubber seal, as supplied with the panel, ensuring that it is in the correct place.
  • Page 10: Electrical Measurements

    14. ELECTRICAL MEASUREMENTS In normal “usage” mode, i.e. thrusters running, boat in the water, with fully charged batteries under ongoing charge (alternator), electrical measurements should be made at the following points: At the batteries At the battery cut-off switch At the fuse At the electric motor’s connections At the power supply arriving at the thruster control box These measurements will enable you to detect voltage drop.
  • Page 11: Safety

    17. SAFETY Switch off means to cut the power at both the DC equipment panel (control power supply) & the thruster battery isolator (thruster power supply) after having used the thruster. Under no circumstances should any flammable products be stored next to the electric components of the thruster.
  • Page 12: Electrical Installation Diagram

    19. ELECTRICAL INSTALLATION DIAGRAM www.max-power.com...
  • Page 13: Relay And Control Box Connections Diagram

    20. RELAY AND CONTROL BOX CONNECTIONS www.max-power.com...
  • Page 14: Spare Parts Diagram

    21. SPARE PARTS DIAGRAM www.max-power.com...
  • Page 15: Spare Parts List

    22. SPARE PARTS LIST CT60-IP / CT80-IP N° Description Quantités Référence Upper motor casing MPOP5836/SUP Backing flange MPOPO5217 Complete relay 12V MP083056/2 Complete relay 24V MP083057/2 Electric Motor CT60-IP / CT80-IP 12V MP053030 Electric Motor CT60-IP / CT80-IP 24V MP053031...
  • Page 16: Troubleshooting Guide

    23. TROUBLESHOOTING GUIDE Before contacting your nearest Max Power distributor, please check the below troubleshooting guide. Problem Check • The control panel does not light Check the 6 wire connector behind the joystick • Check the thruster's electronic control box 6 wire connector •...
  • Page 17: Warranty Coverage

    25. WARRANTY COVERAGE Introduction The purpose of this document is to set out the terms of warranty cover offered in relation to products purchased by the End User from Max Power or its approved network of resellers. This document will adhere to the following format:- Section 1 Definitions Section 2...
  • Page 18 Warranty Terms If the material is used for anything other than for pleasure craft, the guarantee is limited to a six-month period. Year 1 - All factory testing, diagnosis, repairs and replacements are performed at no charge to the End User. All parts and up to two hours of labour are covered for repairs and replacements conducted in the field.
  • Page 19: Warranty Form

    Serial No.: 26. WARANTY FORM VERY IMPORTANT: Please complete this form and fax a COPY to Max Power with a copy of the installation invoice or the invoice of the yacht/boat in order for the warranty to come into effect. To be completed by the owner: Name of owner: Tel.:...

This manual is also suitable for:

Ct80-ip

Table of Contents