Page 1
1 0 0 . 5 7 1 U n i v e r s a l a s s o r t m e n t b o x Necessary tools Pillar drill Parts list Fine saw Rasp Quantity Size in mm Part No. Screwdriver Wood strip 200x50x10...
Page 2
1. The base drawer( Stage 1 ) a) Measure and saw the wooden strips as shown. Mark out and drill the 1.5 mm diameter screw holes ( Diagram 1 ) Dia. 1 b) Mark out and saw the corners of Dia.
Page 3
3. Top drawers ( Stage 3 ) a) Measure and saw the 4 wooden sides Dia. 5 (1) and drill the 1.5 mm diameter holes for the screws ( Diagram 5) b) Mark out and saw the mitred corners, assemble and glue the strips together c) Measure and saw the wood strips for the dividers (3) to 180mm.
Page 4
5. Carrying handle a) Mark out and shape the round the ends of the woo- den strips (5) Drill the 1.5 diameter holes for the screws . Diagram 9 Dia. 9 Note ! there are two holes at the square end of the handle! b) Chamfer both of the handles to section A-A for the length of 180mm.
Page 5
5. Final Assembly a) Mount and screw all the levers in place as shown. Then screw on the carrying handle (Diagrams 13 & 13a) Note ! Do not over tighten the screws on the levers as movement is needed for the box to function Dia.