Download Print this page

Sealey FGE01 Instructions Manual page 4

2.5 x 4.5 x 2.5m foldable steel garage extension

Advertisement

5.5.
STEP 2 (FIG 3)
5.5.1.
Insert tube (fig.3.4) into tube (fig.3.3) and secure it with Bolt M6x55 (fig.3.13) and M6 Nut (fig.3.15), then slide Part (fig.3.5) onto tube
(fig.3.3).
5.5.2.
Connect 1pc of Peak Centre Tube (fig.3.1) and 2pcs of Roof Tube (fig.3.2) as per the below diagram.
5.5.3.
Then use Connecting Plate (fig.3.6) connect end of tube (fig.3.3) and one side of tube (fig.3.2) together using Bolt M6x55 (fig.3.13) and
M6 Nut (fig.3.15).
5.5.4.
In the same way connect the end of tube (fig.3.4) and the other side of tube (fig.3.2) together using Bolt M6x55 (fig.3.13) and M6 Nut
(fig.3.15).
5.5.5.
Repeat above 3 steps to finish the other 4 sections.
5.6.
STEP 3 (FIG.4 & .5)
5.6.1.
Follow the below diagrams (fig.4 & .5), assemble the 5 groups of roof structure onto the two sets of Riser Components (fig.4.10 & 11).
5.7.
STEP 4 (FIG.6 & 7)
5.7.1.
Now assemble pipe Jacking Component (fig.6.12) on top of parts 3 & 4 Brace by M8x70 (fig.6.14) and M8 Nut (fig.6.16).
5.7.2.
Please refer to attached diagram of fig. 7, A, B, C, D. Make sure Axle Tube (fig.6.9) is in the right place, either below part 12, or above
part 12 to make sure the components are spaced evenly.
© Jack Sealey Limited
fig.4
Original Language Version
fig.3
fig.6
FGE01 Issue 1 25/11/2020
fig.5

Advertisement

loading

This manual is also suitable for:

5054511915136