This Site Preparation Guide has been written to assist you in understanding how Bottom line: We want your M3000 Fuel the M3000 automated card reader system Terminal to function 100% as advertised functions and what site infrastructure is and the extra effort spent during the site required for startup.
Note: There are models of this pulser that are designed to mount on the penny wheel and Note: The QT Technologies M3000 can also will not work with gallon only meters control some electronic dispensers. Call QT Technologies for guidance if you have an elec- 2.
Page 4
Figure 3—Dry contact switch schematic - gas station style dispensers resemble the diagram on the left - the dia- gram on the right is the minimum necessary for the M3000 dispenser interface. vided by the terminal to power each reset mo- recommended that a large (10 AWG) ground tor).
QT Technologies LLC Space & Functional Considerations When selecting a location for your M3000 Automated Fuel Terminal, carefully study the dimensions of the pedestal (Figure 7) and terminal head and remember that adequate space must be maintained be- hind the unit for installation and mainte- nance.
This applies to 120V and 240V motors. 3/4" High voltage for reset, clear, slow & fast valves 1/2" Low voltage for telephone wire If you deviate from these requirements, please call QT 3/4" High voltage for terminal and dispenser power Technologies at (303) 444-3590. 1/2"...
This applies to 120V and 240V motors. 1/2" Low voltage for pulser wires* 3/4" High voltage for reset, clear, slow & fast valves If you deviate from these requirements, please call QT 1/2" Low voltage for telephone wire Technologies at (303) 444-3590. 3/4"...
(three for the less steel be used for this purpose. If you have pulsers and two for the ground reel sensors). any questions please do not hesitate to call QT The ground reels (if this option has been spec- Technologies for assistance.
(next page) in preparation for Terminal Head installation. Two popular types of pulsers QT Technologies LLC M3000 Direct Wire - Sample Wiring Diagram Pump L1 Pump L2 Dispenser Power Head Power...
Site Preparation checklist for the M3000 around components and possibly void the Basic and M3000 Pro. The M3000 is al- warranty. Always check with a QT Tech most identical in terms of Site Prep to the...
Additional charges may be incurred if site prepa- ration is not completed as stated. Please initial each item, and sign form and fax to QT Technologies @ (303) 444-8736. An installation cannot be scheduled until this sheet is received, fully completed.
Page 12
(2-3 GPM) for pre-set sale amounts. This item is NOT OPTIONAL. You must have this for the fuel terminal to function correctly. Call QT Tech if you need to order a 2-stage valve. Completed on ___/___/___ by _____________ 8.
Page 13
QT Technologies LLC The site preparation has been completed in compliance with the above checklist. ____________________________________________________ Signature Date ____________________________________________________ Name (Please Print) ____________________________________________________ Company Phone Number Site Name : __________________________________________ QT Technologies LLC (303) 444-3590 FAX (303) 444-8736 Page 13...
Page 14
*Due to the increased market growth of computer products and differing standards of performance applied, not all modems are capable of communicating with the QT Technologies terminal. An QT Technologies technician will work on your modem/configuration for one hour if it does not readily communicate with the fuel terminal at the beginning of the PC setup.
Page 15
1 from the site prep checklist for serial protocol dis- pensers. Refer to the Field Wiring Diagram for Tokheim/Krause Serial Protocol Dispensers (below) as a guide for connecting the M3000 with these types of dispensers. QT Technologies LLC (303) 444-3590 FAX (303) 444-8736 Page 15...
Additional charges may be incurred if site prepa- ration not completed as stated. Please initial each item, and sign form and fax to QT Technologies @ (303) 444-8736. An installation cannot be scheduled until this sheet is received, fully completed.
Page 17
4. The terminal pedestal has been mounted with all appropriate conduits stubbed up to the shelf. (The access doors face to the rear - check with QT Technologies if you need to deviate from this) Completed on ___/___/___ by _____________ 5.