Installation; Step 1 - Check Equipment And Job Site; Unpack Unit; Inspect Equipment - Carrier Infinity 25VNA4 Installation Instructions Manual

Infinity variable speed heat pump with greenspeed intelligence 2 to 5 nominal tons
Hide thumbs Also See for Infinity 25VNA4:
Table of Contents

Advertisement

25VNA4: Installation Instructions
CAUTION
!
EQUIPMENT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage.
If proper lineset routing techniques are not followed, variable speed
systems can be susceptible to lineset transmitted noise inside the
dwelling and, in extreme cases, tubing breakage.
OUTDOOR WALL
CAULK
INSULATION
THROUGH THE WALL
HANGER STRAP
(AROUND SUCTION
TUBE ONLY)
1" (25.4 mm)
MIN
SUSPENSION
Fig. 1 – Connecting Tubing Installation
The outdoor unit contains the correct amount of refrigerant charge for
operation with AHRI rated and factory-approved smallest indoor unit
when connected by 15 ft (4.57 m) of field-supplied or factory accessory
tubing.
Adjust refrigerant charge by adding or removing the charge to/from the
unit depending on lineset length and indoor unit as calculated and
displayed on the UI. The user interface (UI) calculates required charge
adjustment and total system charge required. For proper unit operation,
check refrigerant charge using charging information in the Check Charge
section of this instruction.
IMPORTANT: Liquid-line size is 3/8-in. OD for all 25VNA
applications including long line applications.
IMPORTANT: Always install the factory-supplied liquid-line filter
drier. Obtain replacement filter driers from your distributor or branch.

Installation

IMPORTANT: Effective January 1, 2015, all split system and packaged
air conditioners must be installed pursuant to applicable regional
efficiency standards issued by the Department of Energy.
Specifications for this unit in residential new construction market require
the outdoor unit, indoor unit (including metering device), refrigerant
tubing sets, and filter drier, and muffler listed in pre-sale literature. There
can be no deviation. Consult the Service Manual – Air Conditioners and
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
INDOOR WALL
LIQUID TUBE
SUCTION TUBE
JOIST
INSULATION
SUCTION TUBE
LIQUID TUBE
Heat Pumps Using Puron Refrigerant to obtain required unit changes for
specific applications and for R-22 retrofit.
Step 1 – Check Equipment and Job Site

Unpack Unit

Move to final location. Remove carton taking care not to damage unit.
This unit employs one louver spacer on each of the four sides to prevent
louver movement during operation. The louver spacers are trapped
between the coil surface and louver at the approximate center of each
side (See
Fig.
2). This louver spacer should be present and, if dislodged
during shipment, must be reinstalled before unit is placed into operation.
Fig. 2 – Louver Spacer Location

Inspect Equipment

File claim with shipping company prior to installation if shipment is
damaged or incomplete. Locate unit rating plate on unit corner panel. It
contains information needed to properly install unit. Check rating plate
to be sure unit matches job specifications.
Step 2 – Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie down
A07588
bolts should be used and fastened through knockouts provided in unit
base pan. Refer to unit mounting pattern in
size and knockout hole location.
3/4 IN.DIA TIEDOWN
KNOCKOUTS IN BASEPAN
TWO (2) PLACES
UNIT BASE PAN
Dimension in. (mm)
35 X 35
(889 X 889)
Fig. 3 – Tiedown Knockout Locations
3
Fig. 3
to determine base pan
A
VIEW FROM TOP
TIEDOWN KNOCKOUT LOCATIONS in. (mm)
A
B
9–1/8 (231.8)
6–9/16 (166.7) 28–7/16 (722.3)
A11380a
C
B
C
A05177

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents